Laserfiche WebLink
• EXHIBIT 5 <br />Summary of Construction Expenses <br />Southeast Wye and Team Track <br />New Brighton Minnesota <br />4 -Oct -07 <br />MC Responsibilities <br />Contractor Work <br />Track Construction <br />Subtotal <br />MC Work <br />Upgrade of tie quality <br />Asphalt <br />Asphalt cutting <br />rossing signs <br />MMqW lubricator <br />Power switch <br />Material disposal <br />Equipment <br />Derail <br />Timber Crossing <br />Grading <br />Sub ballast <br />Surfacing <br />Flagging <br />FELA (workman's comp) <br />Railroad support for gas line encasement <br />Subtotal - MC Work <br />Subtotal <br />Construction Administration <br />Engineering <br />Contingency <br />Total - MC responsibilities <br />*City Responsibility <br />CP RR Work <br />Roadway Detour <br />Engineering <br />Execution Copy (10-5-2007) <br />$150,000 <br />Team <br />$150,000 <br />Wye track <br />Track <br />Total <br />$322,236 <br />$95,129 <br />$417,365 <br />2 6 <br />$95.129 <br />$412,365 <br />$6,000 <br />$0 <br />$6,000 <br />$11,000 <br />$0 <br />$11,000 <br />$1,300 <br />$0 <br />$1,300 <br />$700 <br />$0 <br />$700 <br />$14,500 <br />$0 <br />$14,500 <br />$26,000 <br />$0 <br />$26,000 <br />$2,200 <br />$0 <br />$2,200 <br />$11,000 <br />$0 <br />$11,000 <br />$0 <br />$2,500 <br />$2,500 <br />$0 <br />$7,500 <br />$7,500 <br />$33,000 <br />$11,000 <br />$44,000 <br />$19,500 <br />$7,500 <br />$27,000 <br />$22,500 <br />$7,500 <br />$30,000 <br />$2,500 <br />$2,500 <br />$14,354 <br />$6,544 <br />$20,898 <br />$59,913 <br />$0 <br />$59,913 <br />$224a7 <br />42 5 <br />2 7 11 <br />$546,703 <br />$137,673 <br />$684,376 <br />% 8 $43,736 <br />8 $11,014 <br />$54,750 <br />% 8 $43,736 <br />8 $11,014 <br />$54,750 <br />% 10 $54,670 <br />10 $13,767 <br />$68,438 <br />$688,846 <br />$173.468 <br />$862,514 <br />$150,000 <br />$0 <br />$150,000 <br />$20,000 <br />$0 <br />$20,000 <br />$30,000 <br />$5,000 <br />$35,000 <br />