My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-08-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 09-08-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:58:29 PM
Creation date
9/5/2008 2:27:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
instruction Administration $20,000 <br />City Subtotal $220,000 <br />Total $908,846 <br />Assumptions: <br />Wye track expenses will be reimbursed by MNDOT grant money (up to $1,000,000) <br />Right of Way costs is not included. <br />Track abandonment cost is not included <br />Magellan gas line encasement is included (Magellan is expected to pay for encasement) <br />Fiber optic adjustments on CP RR property 1s not included <br />MC costs shown are from 9/28(2007 letter from MC <br />City engineering expenses include geotech, drainage pond permit, property descriptions <br />Roadway detour is for temporary access when 1 st St. S. is closed for construction <br />CP RR work will be a separate force account agreement with the City <br />0 <br />• <br />Execution Copy (10-5-2007) 12 <br />$178,468 <br />$20,000 <br />000 <br />$1,087,314 <br />
The URL can be used to link to this page
Your browser does not support the video tag.