<br />ITEM
<br />SECTION D - WATERMAIN SYSTEM INSTALLATION
<br />ESTIMATED UNIT PRICE
<br />QUANTITY UNIT BID
<br />QUANTITY
<br />TO DATE
<br />TOTAL
<br />NO
<br />ITEM
<br />15
<br />LF
<br />$31.38
<br />EXTRA
<br />TEMPORARY WATER SERVICE TO MIDWEST ASPHALT CORP.
<br />LS $7,252,00
<br />1.00
<br />$7,252.00
<br />EXTRA
<br />SITE STABILIZATION
<br />LS $1,224.93
<br />1.00
<br />$1,224.93
<br />LF
<br />SUB -TOTAL
<br />621.00
<br />$18 817.58
<br />$246,362.69
<br />ITEM SECTION E - STORM SEWER SYSTEM INSTALLATION
<br />NO ITEM
<br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74
<br />$0.00
<br />2521.511 2" BITUMINOUS TRAIL 256 SY $24.09
<br />$0.00
<br />2503.511 4" DIP STORM SEWER PIPE
<br />15
<br />LF
<br />$31.38
<br />20.00
<br />$627.60
<br />2503.511 12" RCP STORM SEWER PIPE
<br />518
<br />LF
<br />$28.95
<br />451.00
<br />$13,056.45
<br />2503.511 15" RCP STORM SEWER PIPE
<br />513
<br />LF
<br />$29.98
<br />621.00
<br />$18 817.58
<br />2503.511 18" RCP STORM SEWER PIPE
<br />225
<br />LF
<br />$34.77
<br />226.00
<br />$7,858.02
<br />2503.511 24" RCP STORM SEWER PIPE
<br />244
<br />LF
<br />$38.11
<br />243.00
<br />$9,260.73
<br />2503.511 27" RCP STORM SEWER PIPE
<br />268
<br />LF
<br />$47.67
<br />269.00
<br />$12,623.23
<br />2503.511 30" RCP STORM SEWER PIPE
<br />118
<br />LF
<br />$53.08
<br />118.00
<br />$6,263.44
<br />2503.511 33" RCP STORM SEWER PIPE
<br />190
<br />LF
<br />$60.85
<br />193.00
<br />$11,744.06
<br />2503.511 36" RCP STORM SEWER PIPE
<br />133
<br />LF
<br />$69.45
<br />123.00
<br />$8,542.35
<br />2503.511 42" RCP STORM SEWER PIPE
<br />85
<br />LF
<br />$97.66
<br />85.00
<br />$8,301.10
<br />2506.502 2T' CATCH BASIN
<br />6
<br />EA
<br />$1,225.00
<br />6.00
<br />$7,350.00
<br />2506.602 48" CATCH BASIN OR STORM SEWER MANHOLE
<br />9
<br />EA
<br />$1,850.00
<br />8.00
<br />$14,800.00
<br />2506.502 60" CATCH BASIN OR STORM SEWER MANHOLE
<br />5
<br />EA
<br />$2 815.50
<br />6.00
<br />$16,893.00
<br />2506.502 72" CATCH BASIN
<br />1
<br />EA
<br />$3,660.00
<br />2.00
<br />$7,320.00
<br />2506.602 INFILTRATION/INFLOW BARRIERS FOR CASTINGS & RINGS
<br />21
<br />EA
<br />$140.20
<br />17.00
<br />$2,383.40
<br />2451.607 42" RCP APRON W/RIP-RAP
<br />1
<br />EA
<br />$2,742.28
<br />1.00
<br />$2,742.28
<br />2105.607 EXCAVATION SPECIAL POND CLEANING
<br />200CY
<br />$12.50
<br />$0.00
<br />2451.603 T X 4' ROCK INFILTRATION TRENCH
<br />640
<br />LF
<br />$63.00
<br />$0.00
<br />SUB -TOTAL
<br />$148,583.23
<br />ITEM SECTION F - STREET INSTALLATION
<br />NO ITEM
<br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74
<br />$0.00
<br />2521.511 2" BITUMINOUS TRAIL 256 SY $24.09
<br />$0.00
<br />2112.501 SUB -GRADE PREPARATION
<br />20.45
<br />RD ST
<br />$302.50
<br />20.45
<br />$6,186.13
<br />2211.501 AGGREGATE BASE CLASS 7 7"
<br />3,575
<br />TON
<br />$12.50
<br />3,768.99
<br />$47,112.38
<br />2360.601 WEARING COURSE MIXTURE MVWE450358
<br />610
<br />TON
<br />$60.61
<br />123.00
<br />$0.00
<br />2360.502 NON -WEARING COURSE MIXTURE LVNW35030B
<br />1,360
<br />TON
<br />$54.78
<br />1,153.81
<br />$63,205.71
<br />2531.501 CONCRETE CURB AND GUTTER, DESIGN B618
<br />5,810
<br />LF
<br />$10.34
<br />4,760.06
<br />$49,219.02
<br />2357.502 BITUMINOUS MATERIAL FOR TACK
<br />320
<br />GAL
<br />$2.48
<br />125.00
<br />$310.00
<br />EXTRA SUB -GRADE CORRECTION
<br />1
<br />LS
<br />$3 000.00
<br />1.00
<br />$3,000.00.
<br />EXTRA MOBILIZATION FOR NORTHDALE STREET CREW
<br />80 TREES
<br />LS
<br />$750.00
<br />1.00
<br />$750.00
<br />EXTRA MOBILIZATION FOR C & C CONCRETE CO.
<br />TREES
<br />LS
<br />$825.00
<br />1.00
<br />$825.00
<br />SUB -TOTAL
<br />TREES
<br />$247.50
<br />$0.00
<br />$170 608.23
<br />ITEM SECTION G - SIDEWALK AND TRAIL INSTALLATION
<br />NO ITEM
<br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74
<br />$0.00
<br />2521.511 2" BITUMINOUS TRAIL 256 SY $24.09
<br />$0.00
<br />2531.602 PEDESTRIAN CURB RAMP TRUNCATED DOME 18 EA $495.00
<br />$0.00
<br />SUB -TOTAL
<br />$0.00
<br />ITEM SECTION H - STREETSCAPE INSTALLATION
<br />NO ITEM
<br />2545.602 SINGLE LUMINAIRE LIGHTING ASSEMBLY
<br />21 EA $6.600.001 21 $138,600.00
<br />2545.602 TRIPLE LUMINAIRE LIGHTING ASSEMBLY
<br />12 EA $9,383.001 12 $112,596.00
<br />2105.525 TOPSOIL BORROW C
<br />1350
<br />CY
<br />$15.50
<br />$0.00
<br />2301.503 CONCRETE PAVEMENT INTEGRALLY COLORED
<br />650
<br />SY
<br />$86.63
<br />750,00
<br />$64,972.50
<br />2301.503 CONCRETE PAVEMENT, CROSSWALK
<br />110
<br />SY
<br />$69.30
<br />123.00
<br />$8,523.90
<br />2301.604 CONCRETE PAVEMENT, SPECIAL - PAVERS
<br />2,900
<br />SF
<br />$8.76
<br />$0.00
<br />2411.505 CONCRETE STRUCTURE PYLON FOUNDATION
<br />17
<br />EA
<br />$660.00
<br />$0.00
<br />2504.602 IRRIGATION SYSTEM CONNECTION
<br />1
<br />EA
<br />$3,773.00
<br />$0.00
<br />2504.602 UNDERGROUND IRRIGATION SYSTEM
<br />1
<br />LS
<br />$38,862.00
<br />0.08
<br />$3,251.66
<br />2571.502 DECIDUOUS TREE 2-1/2" CAL
<br />80 TREES
<br />$303.60
<br />$0.00
<br />2571.503 ORNAMENTAL TREE, 1-1/2" CAL
<br />20
<br />TREES
<br />$187.00
<br />$0.00
<br />2571.503 ORNAMENTAL TREE 8' H7 MULTI -STEM
<br />30
<br />TREES
<br />$247.50
<br />$0.00
<br />2571.505 DECIDUOUS SHRUB, #3 CONT
<br />188 SHRUBS
<br />$29.70
<br />$0.00
<br />2571.507 PERENNIAL #1 CONT
<br />2,556 PLANTS
<br />$13.20
<br />$016
<br />2571.602 VINYL EDGER
<br />350
<br />LF
<br />$1.93
<br />$0.00
<br />2575.505 SOD TYPE LAWN
<br />4,200
<br />SY
<br />$3.85
<br />$0.00
<br />2105.525 EXTRA -TOPSOIL BORROW FROM NORTH PINE WINDROW
<br />CY
<br />$9.00
<br />900.00
<br />8 10000
<br />$8.166 00
<br />SUB -TOTAL
<br />$84,84806
<br />ITEM SECTION I - STREET LIGHT INSTALLATION
<br />NO ITEM
<br />2545.602 SINGLE LUMINAIRE LIGHTING ASSEMBLY
<br />21 EA $6.600.001 21 $138,600.00
<br />2545.602 TRIPLE LUMINAIRE LIGHTING ASSEMBLY
<br />12 EA $9,383.001 12 $112,596.00
<br />2545.602 ELECTRICAL SERVICE/LIGHTING CONTROL PEDESTAL
<br />1 I EA 1 $4,015.001 1.00 1 $4,015.00
<br />SUB -TOTAL
<br />$255.211.00