Laserfiche WebLink
0 <br />• <br />CITY OF NEW BRIGHTON <br />NORTHWEST QUADRANT PHASE I <br />FINAL PAYMENT <br />DATE: JANUARY 13,200 <br />"MM Ano An 4 Q7G1 <br />PAGE 2 OF 3 <br />ITEM <br />SECTION D - WATERMAIN SYSTEM INSTALLATION <br />ESTIMATED UNIT PRICE <br />QUANTITY UNIT BID <br />QUANTITY <br />TO DATE <br />TOTAL <br />NO <br />ITEM <br />15 <br />LF <br />$31.38 <br />EXTRA <br />TEMPORARY WATER SERVICE TO MIDWEST ASPHALT CORP. <br />LS $7,252,00 <br />1.00 <br />$7,252.00 <br />EXTRA <br />SITE STABILIZATION <br />LS $1,224.93 <br />1.00 <br />$1,224.93 <br />LF <br />SUB -TOTAL <br />621.00 <br />$18 817.58 <br />$246,362.69 <br />ITEM SECTION E - STORM SEWER SYSTEM INSTALLATION <br />NO ITEM <br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74 <br />$0.00 <br />2521.511 2" BITUMINOUS TRAIL 256 SY $24.09 <br />$0.00 <br />2503.511 4" DIP STORM SEWER PIPE <br />15 <br />LF <br />$31.38 <br />20.00 <br />$627.60 <br />2503.511 12" RCP STORM SEWER PIPE <br />518 <br />LF <br />$28.95 <br />451.00 <br />$13,056.45 <br />2503.511 15" RCP STORM SEWER PIPE <br />513 <br />LF <br />$29.98 <br />621.00 <br />$18 817.58 <br />2503.511 18" RCP STORM SEWER PIPE <br />225 <br />LF <br />$34.77 <br />226.00 <br />$7,858.02 <br />2503.511 24" RCP STORM SEWER PIPE <br />244 <br />LF <br />$38.11 <br />243.00 <br />$9,260.73 <br />2503.511 27" RCP STORM SEWER PIPE <br />268 <br />LF <br />$47.67 <br />269.00 <br />$12,623.23 <br />2503.511 30" RCP STORM SEWER PIPE <br />118 <br />LF <br />$53.08 <br />118.00 <br />$6,263.44 <br />2503.511 33" RCP STORM SEWER PIPE <br />190 <br />LF <br />$60.85 <br />193.00 <br />$11,744.06 <br />2503.511 36" RCP STORM SEWER PIPE <br />133 <br />LF <br />$69.45 <br />123.00 <br />$8,542.35 <br />2503.511 42" RCP STORM SEWER PIPE <br />85 <br />LF <br />$97.66 <br />85.00 <br />$8,301.10 <br />2506.502 2T' CATCH BASIN <br />6 <br />EA <br />$1,225.00 <br />6.00 <br />$7,350.00 <br />2506.602 48" CATCH BASIN OR STORM SEWER MANHOLE <br />9 <br />EA <br />$1,850.00 <br />8.00 <br />$14,800.00 <br />2506.502 60" CATCH BASIN OR STORM SEWER MANHOLE <br />5 <br />EA <br />$2 815.50 <br />6.00 <br />$16,893.00 <br />2506.502 72" CATCH BASIN <br />1 <br />EA <br />$3,660.00 <br />2.00 <br />$7,320.00 <br />2506.602 INFILTRATION/INFLOW BARRIERS FOR CASTINGS & RINGS <br />21 <br />EA <br />$140.20 <br />17.00 <br />$2,383.40 <br />2451.607 42" RCP APRON W/RIP-RAP <br />1 <br />EA <br />$2,742.28 <br />1.00 <br />$2,742.28 <br />2105.607 EXCAVATION SPECIAL POND CLEANING <br />200CY <br />$12.50 <br />$0.00 <br />2451.603 T X 4' ROCK INFILTRATION TRENCH <br />640 <br />LF <br />$63.00 <br />$0.00 <br />SUB -TOTAL <br />$148,583.23 <br />ITEM SECTION F - STREET INSTALLATION <br />NO ITEM <br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74 <br />$0.00 <br />2521.511 2" BITUMINOUS TRAIL 256 SY $24.09 <br />$0.00 <br />2112.501 SUB -GRADE PREPARATION <br />20.45 <br />RD ST <br />$302.50 <br />20.45 <br />$6,186.13 <br />2211.501 AGGREGATE BASE CLASS 7 7" <br />3,575 <br />TON <br />$12.50 <br />3,768.99 <br />$47,112.38 <br />2360.601 WEARING COURSE MIXTURE MVWE450358 <br />610 <br />TON <br />$60.61 <br />123.00 <br />$0.00 <br />2360.502 NON -WEARING COURSE MIXTURE LVNW35030B <br />1,360 <br />TON <br />$54.78 <br />1,153.81 <br />$63,205.71 <br />2531.501 CONCRETE CURB AND GUTTER, DESIGN B618 <br />5,810 <br />LF <br />$10.34 <br />4,760.06 <br />$49,219.02 <br />2357.502 BITUMINOUS MATERIAL FOR TACK <br />320 <br />GAL <br />$2.48 <br />125.00 <br />$310.00 <br />EXTRA SUB -GRADE CORRECTION <br />1 <br />LS <br />$3 000.00 <br />1.00 <br />$3,000.00. <br />EXTRA MOBILIZATION FOR NORTHDALE STREET CREW <br />80 TREES <br />LS <br />$750.00 <br />1.00 <br />$750.00 <br />EXTRA MOBILIZATION FOR C & C CONCRETE CO. <br />TREES <br />LS <br />$825.00 <br />1.00 <br />$825.00 <br />SUB -TOTAL <br />TREES <br />$247.50 <br />$0.00 <br />$170 608.23 <br />ITEM SECTION G - SIDEWALK AND TRAIL INSTALLATION <br />NO ITEM <br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74 <br />$0.00 <br />2521.511 2" BITUMINOUS TRAIL 256 SY $24.09 <br />$0.00 <br />2531.602 PEDESTRIAN CURB RAMP TRUNCATED DOME 18 EA $495.00 <br />$0.00 <br />SUB -TOTAL <br />$0.00 <br />ITEM SECTION H - STREETSCAPE INSTALLATION <br />NO ITEM <br />2545.602 SINGLE LUMINAIRE LIGHTING ASSEMBLY <br />21 EA $6.600.001 21 $138,600.00 <br />2545.602 TRIPLE LUMINAIRE LIGHTING ASSEMBLY <br />12 EA $9,383.001 12 $112,596.00 <br />2105.525 TOPSOIL BORROW C <br />1350 <br />CY <br />$15.50 <br />$0.00 <br />2301.503 CONCRETE PAVEMENT INTEGRALLY COLORED <br />650 <br />SY <br />$86.63 <br />750,00 <br />$64,972.50 <br />2301.503 CONCRETE PAVEMENT, CROSSWALK <br />110 <br />SY <br />$69.30 <br />123.00 <br />$8,523.90 <br />2301.604 CONCRETE PAVEMENT, SPECIAL - PAVERS <br />2,900 <br />SF <br />$8.76 <br />$0.00 <br />2411.505 CONCRETE STRUCTURE PYLON FOUNDATION <br />17 <br />EA <br />$660.00 <br />$0.00 <br />2504.602 IRRIGATION SYSTEM CONNECTION <br />1 <br />EA <br />$3,773.00 <br />$0.00 <br />2504.602 UNDERGROUND IRRIGATION SYSTEM <br />1 <br />LS <br />$38,862.00 <br />0.08 <br />$3,251.66 <br />2571.502 DECIDUOUS TREE 2-1/2" CAL <br />80 TREES <br />$303.60 <br />$0.00 <br />2571.503 ORNAMENTAL TREE, 1-1/2" CAL <br />20 <br />TREES <br />$187.00 <br />$0.00 <br />2571.503 ORNAMENTAL TREE 8' H7 MULTI -STEM <br />30 <br />TREES <br />$247.50 <br />$0.00 <br />2571.505 DECIDUOUS SHRUB, #3 CONT <br />188 SHRUBS <br />$29.70 <br />$0.00 <br />2571.507 PERENNIAL #1 CONT <br />2,556 PLANTS <br />$13.20 <br />$016 <br />2571.602 VINYL EDGER <br />350 <br />LF <br />$1.93 <br />$0.00 <br />2575.505 SOD TYPE LAWN <br />4,200 <br />SY <br />$3.85 <br />$0.00 <br />2105.525 EXTRA -TOPSOIL BORROW FROM NORTH PINE WINDROW <br />CY <br />$9.00 <br />900.00 <br />8 10000 <br />$8.166 00 <br />SUB -TOTAL <br />$84,84806 <br />ITEM SECTION I - STREET LIGHT INSTALLATION <br />NO ITEM <br />2545.602 SINGLE LUMINAIRE LIGHTING ASSEMBLY <br />21 EA $6.600.001 21 $138,600.00 <br />2545.602 TRIPLE LUMINAIRE LIGHTING ASSEMBLY <br />12 EA $9,383.001 12 $112,596.00 <br />2545.602 ELECTRICAL SERVICE/LIGHTING CONTROL PEDESTAL <br />1 I EA 1 $4,015.001 1.00 1 $4,015.00 <br />SUB -TOTAL <br />$255.211.00 <br />