My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 01-27-2009
NewBrighton
>
Council
>
Packets
>
2009
>
2009 Council Work Session Materials
>
WS 01-27-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 6:57:47 PM
Creation date
1/23/2009 3:54:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Action <br />• Hire architectural firm to conduct analysis of <br />current roof condition and to prepare <br />proposal to address concerns. <br />- Patch problem areas <br />- Re -roof <br />- Fully adhered <br />• Authorize study at February 10'h council <br />meeting <br />Project timeline -proposed <br />• 1/27/09 Council Work session <br />• 2/10/09 Approval to seek design services <br />• 2/30/09 Formal recommendation due to staff <br />• 3110/09 Staff present recommendation to Council <br />• 3124/09 Council approval to seek bids <br />• 4/3/09 Bids due <br />• 4114/09 Approval of bids <br />• May 09 Permit approval process <br />• 6/29/09 Construction begins <br />Architectural Service Quotes <br />• Inspec (revised quote) <br />- Design, Documents, Bid - $9,000 <br />- Construction Observation, testing - $5,200 <br />• Bonestroo <br />- Engineering - $8,000 <br />- Bidding - $1,200 <br />- Contract Admin $3.600 <br />• Kodet Archictural Group, Ltd. <br />- Lump sum quote - $26,400$36,000 <br />Questions? <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.