My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 01-27-2009
NewBrighton
>
Council
>
Packets
>
2009
>
2009 Council Work Session Materials
>
WS 01-27-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 6:57:47 PM
Creation date
1/23/2009 3:54:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 19, 2008 <br />Mr. Brad Martens <br />Recreation Supervisor -FSC Operations <br />City of New Brighton <br />803 Old Highway 8 NW <br />New Brighton, MN 55112 <br />Re: Family Service Center Roof Replacement <br />Proposal for Engineering Services <br />Bonesbw File No. M00335-08005-0 <br />Dear Brad, <br />2335 Highway 36 W <br />St, Paul, IVIN 55113 <br />Tel 651-636-4600 <br />Fax 651-636 1311 <br />www,boilestrao.com <br />* Bonestroo <br />The single -ply ballasted EPDM roofing system on New Brighton's Family Service Center is <br />approximately 14 years old. It is our understanding that the qty of New Brighton plans to move <br />forward with a roof replacement project. <br />As requested at our meeting of December 17, 2008, this letter provides our proposal for engineering <br />services. The scope of this proposal covers services for Phases 2 and 3, which comprise the design, <br />bidding, and construction administration/observation phases of the Project. <br />Project Description <br />The Family Service Center was designed by Williams / O'Brien Associates, Inc. and constricted in <br />1994. <br />Based on the drawings received, the existing single -ply ballasted EPDM roofing membrane is <br />installed over 4" rigid insulation for the majority of the roof with a portion of the roof area having a <br />single layer of 1/2" fire -rated gypsum board over the metal roof decking and 3-1/2" rigid insulation <br />above. The enure roof system is Installed dead level with no slopes shown anywhere on the <br />drawings. <br />It is our understanding that roof leaks have occurred in various locations and that is the reason for <br />replacing the roofing system at this time. We also understand that some of the leaks have occurred <br />over an extended period of time which may indicate some potential damage to the roof insulation, <br />depending on the type of rigid insulation installed. <br />IEngiinewing Services <br />We understand the City of New Brighton desires to cornplete preparation of construction pians and <br />specifications as soon as possible to allow for the bidding of this project <br />See Appendix A for a detailed description of the scope of the engineering services. <br />5t. Paul <br />St. Cloud <br />Rochester <br />Milwaukee <br />Chicago <br />
The URL can be used to link to this page
Your browser does not support the video tag.