My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-10-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 03-10-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 9:36:07 PM
Creation date
3/6/2009 1:08:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF NEW BRIGHTON CONTRACTOR: <br />ENGINEERING DEPARTMENT VEIT & COMPANY, INC. <br />14000 VEIT PLACE <br />0 March 2, 2009 ROGERS, MN 55374 <br />763-428-2242 <br />11 <br />CHANGE ORDER 4 <br />PROJECT 07-5, OLD MILLER DUMP CLOSURE PLAN <br />PURPOSE/DESCRIPTION: The City was not able to gain access to the building during the Old Miller Dump Closure Project <br />bidding process to assess the quantity of hazardous building materials (e.g., asbestos and special wastes) that would require <br />abatement prior to demolition. A placeholder cost of $10,000.00 for hazardous material abatement at the former Post Office <br />building was included in the bid form with the actual abatement cost to be negotiated with Veit following the assessment. <br />Once the Post Office vacated the building, Applied Environmental Services, Inc. (AES) performed a hazardous building <br />materials assessment and quantified the materials that require removal. Veit used the assessment results to obtain three <br />subcontractor bids for the abatement work and selected the lowest bidder. Veit's estimated cost for hazardous material <br />abatement at the former Post Office building based on the assessment results is $28,215.00. The amount of this Change <br />Order ($18,215.00) is for the difference in cost between Veit's estimate and the $10,000.00 placeholder estimate on the bid <br />form. <br />ACTION: THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS: <br />Add $18,215.00 to Bid Item 2.07 Hazard Material Abatement for a total Lump Sum of $28,215.00 <br />ORIGINAL CONTRACT AMOUNT <br />$4,552,943.25 <br />PREVIOUS CHANGE ORDERS <br />$600,400.00 <br />CONTRACT PRICE PRIOR TO CHANGE ORDER <br />$5,153,343.25 <br />NET INCREASE OF CHANGE ORDER 4 <br />$18,215.00 <br />CONTRACT PRICE WITH CHANGE ORDERS $5,171,558.25 <br />CHANGE IN CONTRACT TIME: No Change in Contract Time <br />APPROVED BY: <br />GRAN FFELS <br />DIRECTOR OF P IC WORKS <br />CITY OF NEW BRI HTON <br />APPROVED BY: <br />VEIT & COMPANY, INC. <br />APPROVED BY COUNCIL ACTION: March 10, 2009 <br />DATE Kf� <br />DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.