My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-02-25
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 1982
>
1982-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2005 1:55:37 PM
Creation date
9/14/2005 12:03:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~. <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />City of New Brighton <br />February 25, 1982 <br /> <br />Motion by Blomquist, seconded by Benke to waive <br />the reading and adopt a RESOLUTION ORDERING <br />IMPROVEMENT AND AUTHORIZING PREPARATION OF PLANS <br />AND SPECIFICATIONS FOR THE PROPOSED CONSTRUCTION <br />OF INNSBRUCK NORTH 3RD ADDITION STREETS AND <br />UTILITIES, PROJECT #82-8. <br />4 ayes - 0 nayes - motion carried <br /> <br />The City Engineer reviewed the proposed <br />improvement project and project costs. <br /> <br />Improvement <br />project #82-9 <br />Report No. 82-36 <br />9:41 - 9:46 <br />RESOLUTION #2566 <br /> <br />No one present at the public hearing <br />spoke to the issue. <br /> <br />Motion by Harcus, seconded by Blomquist <br />to close the hearing. <br />4 ayes - 0 nayes - motion carried <br /> <br />Motion by Blomquist, seconded by Janecek to <br />waive the reading and adopt a RESOLUTION <br />ORDERING IMPROVEMENT AND AUTHORIZING PREPARATION <br />OF PLANS AND SPECIFICATIONS FOR THE PROPOSED <br />CONSTRUCTION OF INNSBRUCK NORTH SILVER LAKE <br />ADDITION STREET AND UTILITIES PROJECT #82-9 <br />subject to approval of the final plat. <br />4 ayes - 0 nayes - motion carried <br /> <br />The City Engineer reviewed the proposed <br />improvement project and project costs. <br />The City Engineer noted that a road test <br />had been conducted on the site and it was <br />found that the existing road and base <br />would not be adequate for just overlaying <br />and that the whole road had to be reconstructed. <br /> <br />Improvement <br />Project #82-10 <br />Report No. 82-36 <br />9:47 - 10:04 <br />RESOLUTION #2567 <br /> <br />The Mayor with consent of the City Council <br />directed receipt of a letter from Mr. Robert G. Monson. <br /> <br />Floyd Thompson, 4523 Birch Court, Shoreview, <br />stated that he was the owner of the vacant <br />property and asked what the proposed cost of <br />the assessment would be. <br /> <br />The City Engineer stated that the estimated <br />cost was $6.84 per lineal front foot. <br /> <br />Mr. Thompson asked if the whole street had <br />to be replaced or if it could be just patched <br />or overlayed. <br /> <br />The City Engineer replied that the roads in <br />the area had been constructed between 1965 <br />and 1967 and that several portions were very, <br />very bad and had been patched many times. <br />The City Engineer further replied that a test <br />had been conducted on the street to see if it <br />could just be over1ayed and that that test indicated <br />the roads were not in sufficiently good condition <br />to justify just an overlay project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.