My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
void2
NewBrighton
>
Council
>
Packets
>
2009
>
2009 Council Work Session Materials
>
void2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 6:30:30 PM
Creation date
6/5/2009 11:52:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NWQ Update Memo <br />June 5, 2009 <br />Page 3 <br />site landfill. Assuming that the cleanup work at the propane parcel is conducted in <br />2009 as part of Veit's on-going Miller Dump Closure project, it is estimated that the <br />cleanup cost will be roughly $90,000 to $120,000. The cost will depend on the amount <br />of material that is encountered during excavations in the former railroad right-of-way. <br />The good news is that the City still has $62,600 in unspent funds from the 2006 Met <br />Council TBRA grant for the western portion of the NW Quadrant. However, these funds <br />must be spent by no later than December 31, 2009. The strategy would be to use Veit <br />Companies to carryout the work given the favorable unit pricing for removing <br />contaminated soils. Again, if there is interest by Council, staff would present this item <br />for formal approval later this summer. The project could proceed fairly quickly because <br />the City's Response Action (RAP) has already been approved by the MPCA. <br />Ferrellgas Clean -Up <br />The last item for discussion on Tuesday concerns the clean-up of the former Ferrellgas <br />property. Two environmental concerns were identified during Belair's demolition work at <br />the propane parcel in 2008 which will need to be addressed prior to redevelopment of <br />the property. An area of shallow ash -containing debris was encountered below gravel <br />parking surface and a deeper area of petroleum contaminated soil was encountered in <br />the central portion of the property. The two areas include an estimated 3,000 cubic <br />yards of materials and are shown on the attached figure. In 2007, a stormwater <br />infiltration area was constructed on the portion of the site located north of the impacted <br />areas and the rest of the site is currently vacant. <br />There are two approaches that could be considered to address the two contamination <br />areas. The first approach would involve construction of a four foot clean soil cover over <br />the areas, which would better position the property for future commercial or park <br />development, assuming that the development can be designed around the clean cover <br />(grading, basements, geotechnical requirements, etc.). The second approach would <br />involve excavation and off-site landfill disposal of two contaminated areas, which clean <br />backfill of the deeper petroleum excavation area. The second approach would allow <br />more freedom to redevelopment the site, including future residential land use which is <br />included in the most recent concept plan. <br />Assuming that the cleanup work at the propane parcel is conducted in 2009 as part of <br />Veit's on-going Miller Dump Closure project, it is estimated that the clean cover would <br />cost approximately $50,000 and the complete removal would cost about $100,000. In <br />either case, MPCA will require preparation of an updated cleanup plan for their review <br />and approval. <br />There are a number of advantages to cleaning up the property now. For example, the <br />above estimates are based on the unit pricing from Veit Companies. If the project were <br />bid independently, it is likely that the costs would be higher do to bidding and <br />mobilization fees. Second, by cleaning up the property now (2009), the City would <br />