My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-09-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 06-09-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:10:10 PM
Creation date
6/5/2009 12:54:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />n <br />LJ <br />June 4, 2009 <br />F3o & N/I E=- N I < If <br />Mr. Grant Wyffels, P.E. <br />Public Works Director/City Engineer <br />City of New Brighton <br />803 Old Highway 8 NW <br />New Brighton, MN 55112-2797 <br />Consulting Engineers & Surveyors <br />1222.4 Nicollet Avenue • Burnsville, MN 55337 <br />Phone (952) 890-0509 • Fox (952) 890-8065 <br />www.bolton-menk.com <br />RE: Proposal for Professional Engineering and Surveying Services <br />Old Highway 8 Trail and Watermain Improvements <br />City of New Brighton, MN <br />Dear Mr. Wyffels: <br />Nom® <br />We are pleased to offer you this proposal for assisting with engineering and surveying for the Old <br />Highway 8 Trail and Watermain Improvements. Based on our meeting with you and your staff on June <br />2nd as well as our walk of the entire project site, we propose to assist with the following: <br />Topographic Survey- Includes expanding the westerly portion of the E.G. Rud & Sons, <br />Inc. survey on the extremely steep and wooded slope and securing Gopher 1 -Call private <br />utility information. Also includes "blending" and mapping the ASCII file for points in <br />both surveys. <br />Final Design- Design of a 12" watermain upgrade for trenchless installation either behind <br />the westerly curb line of Old Highway 8 or beneath the existing southbound lane. Also <br />includes the design of a trail from MH 8 to MH 11 (located in the SW quadrant of Old <br />IIighway 8 and CSAH 96). This trail is proposed for access to the City's existing <br />sanitary sewer manholes. Cross-sections will be prepared for the trail design along with a <br />Storm Water Pollution Prevention Plan (SWPPP). Construction documents including <br />special provisions and bidding documents will also be prepared. <br />Bidding- Assist with advertising, preparation of any addenda, bid abstract preparation <br />and attend bid opening along with a recommendation on award of contract. <br />Exhibit I within the attached Agreement for Professional Services summarizes our proposed scope of <br />work. We estimate a total fee of $29,350.00. We propose to work on an hourly basis with a not -exceed <br />this amount. <br />The following is a proposed schedule if this proposal is accepted by the City: <br />Survey: ........................................................................................... Week of June 15th <br />FinalDesign: ._.. ........................... ........................................................................ June 24 -- Julyl0 <br />(50% design review around July V) <br />Submit Plans for Ramsey County Parks Department Review: .................... July 10 -- Sept. 4, 2009 <br />(60 -day review period) <br />Bid Date: .......................................................................September 16, 2009 <br />N VROPOSAMNew Brighton\Trail & Trenchless Wmn 060309\Revised Wyffels 060309.doc <br />DESIGNING FOR A BETTER TOMORROW <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.