Laserfiche WebLink
ow oty0f <br />NEW <br />BRK14" <br />Me cite that wurTks for you <br />July, 2009 <br />Dear New Brighton Resident <br />The streets in your neighborhood are scheduled to be seal coated this summer. <br />Please see the map on the back of this sheet for the location of streets being seal <br />coated. <br />Streets are seal coated 5 years and again at 13 years after their construction or <br />reconstruction. Seal coating is considered routine maintenance and there is no <br />direct charge or assessments to the property owners for this work. <br />Seal coating is a process of distributing bituminous oil, or liquid asphalt, on the <br />Otreet surface and then covering it with small rock chips. The rock is allowed to <br />work into the oil for approximately 10 to 14 days and then the excess rock is swept <br />up. The new seal coat provides the street a new waterproof surface and uniform <br />look. Prior to seal coating, the City cleans and fills pot holes and cracks, and <br />thoroughly sweeps the streets. <br />When the "NO PARKING" signs are put up, please do not park on the streets <br />being seal coated until the work has been completed. You may drive on the streets <br />immediately after the seal coat is applied but we ask that you drive slowly to <br />minimize dust and scuffing of the new surface. <br />City of New Brighton <br />Engineering Department <br />(651)638-2050 <br />• <br />