sIbNEW Of Report Number 09-281 <br />�� Agenda Section VI-8 <br />the city that works for you Council Meeting Date November 24, 2009 <br />REQUEST FOR COUNCIL CONSIDERATION <br />ITEM DESCRIPTION: CONSIDERATION OF PARTIAL PAYMENT 1 AND CHANGE <br />ORDER 1 FOR PROJECT 09-9, OLD HIGHWAY 8 NW WATERMAIN UPGRADE <br />DEPARTMENT HEAD'S APPROVAL: L-M'd <br />CITY MANAGER'S APPROVAL: % <br />No comments to supplement this report - _ ,�/" Comments attached <br />Recommendation: To approve Partial ent 1 and Change Order 1 to the contract for Project 09-9, Old <br />Highway 8 NW Watermain Upgrade in 6dtotal amount of $201,002.23 to G.M. Contracting, Inc. <br />Legislative History: The project plans and specifications were approved by Council on August 11 and a <br />contract was awarded to GM Contracting, Inc. on September 22, 2009. <br />Financial Impact: Please see attached payment breakdown for details. <br />Explanation: As part of the Old Highway 8 Reconstruction project, a 12 -inch watermain was constructed <br />from 1-694 and extended just past the Long Lake Regional Park entrance. This project consists of extending <br />the 12 -inch watermain from the park entrance to the existing 8 inch watermain south of Applewood Point at <br />Highway 96. The 2,800 linear feet of new watermain is being directionally drilled along the west side of Old <br />Highway 8. <br />Also, included in this project is the construction of an access trail to the existing sanitary sewer that runs <br />parallel to and west of the new watermain. <br />Change Order 1 involves the reconnection of the existing water service to the new hotel currently under <br />construction. The existing water service was found to be 18ft deep in the location where the new watermain <br />is installed. To connect to the new watermain a huge hole would have to be dug that would result in a large <br />excavation in Old Highway 8. The water service at this depth would be very difficult and expensive to <br />repair. To eliminate excavating into the roadway and problems in the future, the City requested the <br />Contractor reinstall a new service at a normal depth. The depth of the hotel water service was not known at <br />the time of the bid therefore this work was not anticipated. The total cost of Change Order 1 is $9,848.38 <br />and is included in Partial Payment 1. <br />The provisions of the contract with stipulate that the City makes a partial payment to the contractor at least <br />once each month at regular intervals on the basis of the work performed during that preceding :month. <br />Costs and Funding: The watermain has been programmed in the water rates and will be funded from the <br />Water Improvement fund. The access trail will be funded from the Sanitary Sewer Improvement fund. <br />Gran M. Wyffels, A. <br />Director of Public Works <br />Attachments <br />