My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-24-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 11-24-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2018 12:46:33 AM
Creation date
11/20/2009 1:29:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF NEW BRIGHTON <br />ENGINEERING DEPARTMENT <br />PROJECT 09-9, OLD HIGHWAY 8 NW WATERMIAN UPGRADE <br />AWARTIAL PAYMENT 1 <br />ATE: NOVEMBER 13, 2009 <br />r" uun- Ann Anono�7r4 <br />4 <br />CONTRACTOR: GM CONTRACTING, INC <br />19810 515TH AVENUE <br />LAKE CRYSTAL, MN 56055 <br />PHONE: (507)726-6433 <br />FAX: (507)726-6399 <br />ITEM <br />NO. <br />ITEM <br />ESTIMATED <br />QUAN <br />UNIT <br />UNIT PRICE <br />I BID <br />QUANTITY <br />THIS PAYMENT <br />QUANTITY <br />TO DATE <br />TOTAL <br />AMOUNT <br />SCHEDULE'A' - WATERMIAN IMPROVEMENTS <br />1 <br />MOBILIZATION <br />0.75 <br />LS <br />$7906.91 <br />1 <br />1 <br />$7,906.91 <br />2 <br />TRAFFIC CONTROL <br />0.75 <br />LS <br />$3,917.49 <br />1 <br />1 <br />$3,917,49 <br />3 <br />REMOVE WATERMAIN PIPE AND FITTINGS <br />77 <br />LF <br />$3.01 <br />10 <br />10 <br />$30.10 <br />4 <br />REMOVE HYDRANT <br />3 <br />EA <br />$187.47 <br />0 <br />0 <br />$0.00 <br />5 <br />REMOVE AND REPLACE CONCRETE CURB AND GUTTER <br />20 <br />LF <br />$33.48 <br />46 <br />46 <br />$1,540,08 <br />6 <br />REMOVE BITUMINOUS OR CONCRETE PAVEMENT <br />87 <br />SY <br />$12.36 <br />49 <br />49 <br />$605.64 <br />7 <br />14" WMN - HDPE DR 11 CTRENCHLESS INSTALLATION <br />2040 <br />LF <br />$60.75 <br />2.105 <br />2105 <br />$127,878.75 <br />8 <br />8" WMN - C900 <br />20 <br />LF <br />$22.75 <br />42 <br />42 <br />$955.50 <br />9 <br />6" WMN - C900 <br />55 <br />LF <br />$19.60 <br />35 <br />35 <br />$686.00 <br />10 <br />12" WMN - C900 <br />60 <br />LF <br />$31.10 <br />50 <br />50 <br />$1,555.00 <br />11 <br />12" GV AND BOX <br />4 <br />EA <br />$2,578.03 <br />4 <br />4 <br />$10,312.12 <br />12 <br />8" GV AND BOX <br />2 <br />EA <br />$1,635.83 <br />3 <br />3 <br />$4,907.49 <br />13 <br />6" GV AND BOX <br />5 <br />EA <br />$1,286,93 <br />4 <br />4 <br />$5 147.72 <br />14 lWMN <br />FITTINGS <br />1980 <br />PD <br />$4.85 <br />3.065 <br />3065 <br />$14,865.25 <br />15 <br />CONNECT TO EXISTING WMN <br />6 <br />EA <br />$1,246.73 <br />5 <br />5 <br />$6,233.65, <br />16 <br />HYDRANT <br />3 <br />EA <br />$2,750.90 <br />3 <br />3 <br />$8.25170 <br />17 <br />ADJUST GV BOX <br />4 <br />EA <br />$145.05 <br />0 <br />0 <br />$0.00 <br />18 <br />SILT FENCE <br />425 <br />LF <br />$2.06 <br />157 <br />157 <br />$323.42 <br />19 <br />HAUL AND PLACE AGGREGATE BASE C <br />27 <br />CY <br />$20.60 <br />18 <br />18 <br />$370.80 <br />20 <br />BITUMINOUS STREET PATCH <br />47 <br />SY <br />$67.02 <br />49 <br />49 <br />$3,283.98 <br />21 <br />4" CONCRETE WALK <br />360 <br />SF <br />$5.41 <br />625 <br />625 <br />$3 381.25 <br />22 <br />TOPSOIL BORROW C <br />50 <br />CY <br />21.07 <br />0 <br />0 <br />$0.00 <br />23 JTURFESTABLISHMENT <br />- WATERMAIN 1 <br />1.00 1 <br />LS 1 <br />$2,018.801 <br />0 1 <br />0 <br />$0.00 <br />$202,153,85 <br />SCHEDULE'B' - TRAIL IMPROVEMNTS <br />1 <br />MOBILIZATION <br />0.25 <br />LS <br />$12146.44 <br />$0.00 <br />2 <br />TRAFFIC CONTROL <br />0.25 <br />LS <br />$4,741.16 <br />$0.001 <br />3 <br />REMOVE AND REPLACE CONCRETE CURB AND GUTTER <br />25 <br />LF <br />$33.48 <br />$0.00 <br />4 <br />REMOVE BITUMINOUS OR CONCRETE PAVEMENT <br />91 <br />SY <br />$12.36 <br />$0.00 <br />5 <br />CLEAR AND GRUB TREE <br />16 <br />EA <br />$450.63 <br />$0.00 <br />6 <br />ADJUST MH CASTING MnDOT 2506.522 <br />5 <br />EA <br />$145.06 <br />0.00 <br />7 <br />RECONSTRUCT MH MnDOT 2506.503 <br />1.5 <br />LF <br />$556.76 <br />$0.00 <br />8 <br />COMMON EXCAVATION P E <br />804 <br />CY <br />$14.83 <br />$0.00 <br />9 <br />HAUL AND PLACE AGGREGATE BASE C <br />343 <br />CY <br />$11.11 <br />$0.00 <br />10' <br />TYPE LV4 BITUMINOUS MIXTURE FOR TRAIL <br />172 <br />TON <br />$89.70 <br />$0.00 <br />11 <br />BITUMINOUS STREET PATCH <br />3 <br />SY <br />$67.02 <br />$0.00 <br />12 <br />7" CONCRETE DRIVEWAY APRONIPED RAMP <br />20 <br />SY <br />$60.26 <br />$0.001 <br />13 <br />4" CONCRETE WALK <br />475 <br />SF <br />$4.89 <br />$0.00 <br />14 <br />TRUNCATED DOMES <br />16 <br />SF <br />$41.24 <br />$0.001 <br />15 <br />SILT FENCE <br />1140 <br />LF <br />$1.75 <br />$0.00 <br />16 <br />INLET PROTECTION <br />1 <br />EA <br />$103.00 <br />0.00 <br />17 <br />TOPSOIL BORROW C <br />232 <br />CY <br />$21.07 <br />$0.00 <br />18 <br />TURF ESTABLISHMENT - TRAIL <br />1.00 <br />LS <br />$4,274.50 <br />$0.00 <br />19 IFURNISH <br />AND INSTALL SIGN <br />$180.251 <br />$0.00 <br />SCHEDULE <br />-15" - BUISTUTAL <br />$0.00 <br />CHANGE ORDER 1 <br />1-1 ICONNECT <br />WATER SEVICE AT HOTEL PARKING LOT <br />$9,648.38 <br />TOTAL OF WORK TO DATE <br />LESS RETAINAGE (5%) <br />SUB -TOTAL <br />LESS PREVIOUS PAYMENTS <br />TOTAL OF PARTIAL PAYMENT 1 <br />$212,002.23 <br />$10,600,11 <br />$201,402.12 <br />$0.00 <br />$201,402.12 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.