Laserfiche WebLink
CHANGE ORDER 1 <br />CCONTRACTING, INC. <br />. BOX 736 <br />LAKE CRYSTAL, MN 56055 <br />PROJECT: New Brighton - Old Highway 8 NW Watermain Upgrade <br />PROJECT NUMBER: 09-9 <br />WORK ORDER #1 (revised) <br />Date 10/19/2009 <br />Bore New Water Service Under Old Highway 8 (Hotel) <br />This work order is to bore a new water service under Old Highway 8 up to the new hotel being build' <br />The existing water service was found to be 18ft deep in the location where the new watermain is <br />proposed. To connect to the new watermain a large hole would have to be dug in this location which <br />would get into Old Highway 8. To eliminate this from dcouring, it was requested that a price be given to <br />bore a new water service up to the hotel and keep the water service at normal bury depth. This would <br />eliminate the need to cut into Old Highway 8 becuase the connection pit would be much shallower. This <br />work was not anticipated at the time of the bid and would need to be paid for by change order. <br />Item <br />®rill Water Service <br />Connect Water Service Near <br />Hotel Parking Lot <br />TOTAL <br />MARK HERRICK <br />ENGINEERIINSPECTOR <br />803 OLD HIGHWAY 8 NW <br />ADDRESS <br />NEW BRIGHTON, MN 55112 <br />A URE <br />DATE <br />Quantity UNIT PRICE EXTENSION <br />1 LS $8,308.38 8,308.38 <br />1 LS $1,540.00 1,540.00 <br />GM CONTRACTING <br />CONTRACTOR <br />PO BOX 736 <br />ADDRESS <br />LAKE CRYSTAL MN <br />DATE <br />$9,848.38 <br />CITY OF NEW BRIGHTON <br />DwNER <br />803 OLD HIGHWAY 8 NW <br />ADDRESS <br />NEW BRIG TON, MN 55112 <br />V ILII -1 <br />DA <br />