My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 01-12-2010
NewBrighton
>
Council
>
Packets
>
2010
>
2010 Council Work Session Materials
>
WS 01-12-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 6:54:21 PM
Creation date
1/8/2010 3:20:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />RESOLUTION NO. 09-085 <br />STATE OF MINNESOTA <br />COUNTY OF RAMSEY <br />CITY OF NEW BRIGHTON <br />RESOLUTION ORDERING PROJECT AND AUTHORIZING PREPARATION OF <br />PLANS AND SPECIFICATIONS FOR PROJECT 10-3, SILVER LANE <br />RECONSTRUCTION. <br />WHEREAS, pursuant to Resolution 09-069 of the. City Council of the City of New <br />:on, adopted November 9, 2009, a date was set for a Council Hearing on proposed <br />vement Project 10-3, Silver Lane Reconstruction; and, <br />WHEREAS, ten days published notice of the hearing through two weekly <br />ications of the required notice was given and the hearing was held thereon the 8th <br />of December, 2009, at which time all persons desiring to be heard were given an <br />eunity to be heard thereon. <br />NOW, THEREFORE LET IT BE RESOLVED, by the City Council of the City of <br />Brighton, Minnesota: <br />1. Such improvement is hereby ordered as proposed. <br />2. St. Anthony's City Engineer, WSB and Associates, Inc., (WSB) is hereby <br />designated as the engineer for this improvement project and is hereby <br />authorized to proceed with the preparation of the plans and specifications. Said <br />plans and specifications must be approved by the City of New Brighton prior to <br />advertisement of bids. <br />3. Subject to the approval of the City Attorney, enter into a cooperative agreement for the <br />administration and division of costs associated with silver lane reconstruction in the <br />cities of New Brighton and Saint Anthony. The agreement will outline the costs for <br />design services for the engineer. WSB's costs shall be limited to 9 percent of the <br />contract costs, up to a maximum $60,000 total, exclusive of geotechnical and <br />construction material testing costs. <br />this 8th day of December, 2009.. <br />Vianiel A. Maiers <br />*ector of Finance and Support Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.