Laserfiche WebLink
• <br />Id <br />(i <br />K <br />d) <br />m <br />U <br />N <br />Q <br />S 9 <br />6 <br />5 <br />4 <br />0.01 0.05 0.1 0.5 1 5 10 50 100 <br />Net construction cc st, in millions of dollars <br />a- <br />FIG. 2 -- CURVE B, MEDIAN COMPENSATION FOR BASIC SERVICES, <br />EXPRESSED AS A PERCENTAGE OF CONSTRUCTION COST FOR <br />�-PR.OJLCTS OF AVERAGE COMPLEXITY. <br />From 1972 ASCE Manual No. 45 <br />777 <br />Net Construction % From <br />Cost Curve 8 <br />50,000 10.05 <br />100,000 9 01 <br />250,000 7:81 <br />500,000 7.00 <br />750,000 6.63 <br />1,000,000 6.22 <br />2,000,000 5.75 <br />4,000,000 5.30 <br />6,000,000 5.10 <br />8,000,000 5.05 <br />10,000,000 4.97 <br />20,000,000 4.88 <br />01 <br />0.01 0.05 0.1 0.5 1 5 10 50 100 <br />Net construction cc st, in millions of dollars <br />a- <br />FIG. 2 -- CURVE B, MEDIAN COMPENSATION FOR BASIC SERVICES, <br />EXPRESSED AS A PERCENTAGE OF CONSTRUCTION COST FOR <br />�-PR.OJLCTS OF AVERAGE COMPLEXITY. <br />From 1972 ASCE Manual No. 45 <br />