Laserfiche WebLink
• <br />14 <br />IS <br />12 <br />Vol <br />8 <br />CD <br />CL <br />C 9 <br />6 <br />5 <br />4 <br />mill <br />11111 F_T___FTPT <br />Net Construction % From <br />Cost Curve A <br />i <br />50,000 13.22 <br />100,000 11.63 <br />250,000 9.75 <br />500,000 8.52 <br />750,000 7.90 <br />1 '000,000 7.53 <br />2,000,000 6.82 <br />4,000,000 6.36 <br />6,000,000 6.20 <br />MINN <br />8,000,000 6.10 <br />00 6.03 <br />20,000,000 5.80 <br />01111111 <br />HIM <br />i <br />liiiiiii <br />Ilip <br />11111 <br />III <br />11111101 <br />1 <br />HIM <br />111 <br />HIM <br />ENNUI <br />NOUN <br />I <br />111111111 <br />11111 <br />1111111 <br />0.01 0.05 0.1 0.5 1 5 10 50 100 <br />Net construction cost, in millions of dollars <br />FIG. 1 — CURVE A, MEDIAN COMPENSATION FOR BASIC SERVICES, <br />EXPRESSED AS A PERCENTAGE OF CONSTRUCTION COST FOR <br />PROJECTS OF ABOVE-AVERAGE COMPLEXITY. <br />is From 1972 ASCE Manual No. 45 <br />—13— <br />• <br />