My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-23-2010
NewBrighton
>
Council
>
Packets
>
2010
>
CCP 02-23-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 9:23:16 PM
Creation date
2/19/2010 2:00:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N M1 <br />Gundlach stated it would be very difficult to vandalize to a point where someone <br />could be harmed. <br />Rob Viera stated it would be very difficult to break into the cabinet. They are open <br />to landscaping ideas, fences, we could take special care with it. Norton asked what <br />kind of voltage? Viera stated it is single phase; 200 amps; not the big 3 phase. <br />Trevorrow inquired about the amount of revenue they take in. Gundlach thought it <br />was about $20,000 per site. <br />Samuelson asked what would happen if there were no customers for the wireless <br />service. Viera stated Clearwire has done well in other areas, he believes they will <br />here. If they did not have customers, Clearwire would need to remove the <br />structure. <br />MOTION BY TREVORROW, SECONDED BY NORTON, TO APPROVE <br />CLEARWIRES APPLICATION FOR USING THE EXISTING POLE AT <br />CREEKVIEW PARK. MOTION CARRIED. <br />Trevorrow asked if we should have some kind of landscaping around the tower? <br />The Parks, Recreation and Environmental Commission members agreed this <br />would be good. <br />• Gundlach stated if the Commission had expectations, you could specify that for <br />the Planning Commission. Otherwise between now and the Planning Commission <br />meeting she would ask Mr. Viera to propose the screening plan for the ground <br />equipment for these parks and we will include that for the Planning Commission <br />consideration, for the Public Hearing , as well as the neighborhood meeting <br />occurring a week from this Thursday. <br />Frischman stated that what they are thinking is to have the equipment box covered <br />by some type of natural vegetation to alleviate graffiti. We would like landscaping <br />on all,4 sides. The height of vegetation should completely cover the mechanical <br />box. Frischman added that we do not want to see fences or barbed wire, just trees <br />or natural vegetation; year round. The landscaping would be something that is <br />low -maintenance. <br />MOTION BY TREVORROW, SECONDED BY HARRELD, THAT WE <br />ACCEPT CLEARWIRE'S APPLICATION CONSIDERING THERE WOULD <br />BE SOME KIND OF LANDSCAPE PLAN IN FREEDOM PARK. MOTION <br />CARRIED. <br />IX. Announcements <br />A. Chair Updates <br />Frischman inquired of members if they want to hold a December meeting. In the <br />• past we have been consistent in not having a meeting. Breuer stated her <br />recommendation would be to not hold a meeting but have the flexibility to call a <br />meeting should we get something of a time -sensitive nature, such as a permit <br />application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.