Laserfiche WebLink
Report Number 10-178 <br />Agenda Section VINI <br />Council Meeting Date July 27, 2010 <br />arc ery raw Warks[ you <br />REQUEST FOR COUNCIL CONSIDERATION <br />DXMI)MCRIPITON: PUBLICIMPROVEMENTREARINGFORPROJECTIO-15,7 <br />STREET SIDEWALK BETWEEN 23RD AVENUE AND INCA LANE. <br />DEPARTMENT HEAD'S APPROVAL: t vvr <br />CITY MANAGER'S APPROVAL: <br />Noccumnearruslosupplement this ort 0.i Comments attached <br />Recommendation: <br />1) To hold a Public Improvement Hearing on proposal Project 10.15, 7e Street Sidewalk Between 23a <br />Avenue and Inca Lane. <br />2) To adopt the Resolution call Project 10 15, 7s' Stmt Sidewalk Between 23is Avenue and Inca Lane, <br />and designate the City Engineer as the engineer for this improvement and auMarim the installation of etre <br />crosswalk as proposed In Me feasibility Macy. <br />Legislative Hisary: In March of 2010, Me City Council ordered a feasibility study for a sidewalk <br />improvement p ject from 23rd Avenue NWto Inca Lane along the south side of JM Saee[NW. <br />On Thursday, July I, 2010, an infoumtio al meeting was held with residents to be aRated by Ws proposed <br />• <br />project. Men residents present at Me meeting were not M favor of a sidewalk project. However, most were in <br />favor of Me wsmllation of a new crosswalk a Inca Lane. Information about this meeting is included in Me <br />feasibility study. At Me July 13, 2010, council meeting Me City Council accepted Me Feasibility Study for <br />Project 10-15 and set the Public Improvement Heating for July 27, 2010. <br />Notices of Me Public Improvement Hearing were mailed a ptopeny, owners to he afiecfed by this proposed stmt <br />reconstruction project, and published fa the local newspaper. <br />placement Impact: This p jeet, if approved, would be funded from MSA fonds. <br />Explanation: The purpose oftlow them is a hold the Public Improvement Heating for proposed Project 10-15,F <br />Street Sidewalk Between 23'" Avenue and Inca Lane. A presentation oftbe Feasibility study will be made by staff <br />priory Me opening of Me Public Improvement Hearing. <br />If the Council approves the project at the Public Improvement Hearing staff will coordinate bids and select Me <br />lowest responsible bidder a install the crosswalk as proposed in Mef ibility Macy. <br />Comp and Funding: The cast estirnats to construct Me crosswalk is $4,200, which would be funded from MSA <br />f*=: <br />llblic fes <br />. Attachments <br />Resolution <br />