My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-27-2010
NewBrighton
>
Council
>
Packets
>
2010
>
CCP 07-27-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:35:09 PM
Creation date
7/23/2010 2:11:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RESOLUTION NO. to - <br />STATE OF MINNESOTA <br />COUNTY OF RkMSEY <br />CITY OF NEW BRIGHTON <br />RESOLUTION ORDERING PROJECT AND AUTHORIZING INSTALLATION OF <br />A CROSSWALK FOR PROJECT 10-15, boa STREET SIDEWALK BETWEEN Man <br />AVENUE NW AND INCA LANE. <br />WHEREAS, personal to Resolution 10-043 of the City Council of the City of New <br />Brighton, adopted July 13, 2010, the feasibility study was accepted and a daze was ad for a <br />Cowed Hearing on proposed Improvement Project 10-15,7a Street Sidewalk Between 23'o <br />Avenue NW and Inca Ione; and, <br />WHEREAS, published notice of the hearing was given and the hearing was held <br />thereon the 29th day ofJuly, 2010, az which time all persons desiring to he heard were given <br />an opportunity to be heard [hereon. <br />NOW, THEREFORE LET IT BE RESOLVED, by the City Council of the City of <br />New Brighten, Mirmesom <br />• 1. Such improvement is hereby cMered as proposed. <br />2. The City Engineer is hereby designated as the engineer for [his hnprovemeat aad <br />is hereby authorized m install the crosswalk as proposed in the feasibility study. <br />Adopted this 29th day of July, 2010. <br />ATTEST: <br />Dave Jzcobsen, Mayor <br />Daniel A. Maiers Dean Lotter, City Manager <br />Director of Finance and Support Services <br />(SEAL) <br />
The URL can be used to link to this page
Your browser does not support the video tag.