CITY OF NEW BRIGHTON <br />ENGINEERING DEPARTMENT <br />PROJECT 904, OLD HIGHWAY B NW WATERMIAN UPGRADE <br />FINAL PAYMENT <br />DATE: JULY 27, 2010 <br />FUND: d0"0909A751 <br />CONTRACTOR: GM CONTRACTING, INC <br />19810 515TH AVENUE <br />LAKE CRYSTAL, MN 56055 <br />PHONE: (507)726-6433 <br />FAX: (507)726-6399 <br />. _.._.. <br />ITEM <br />N0. <br />ITEM <br />ESTIMATED <br />CLAN <br />I UNIT <br />UNR PRICE <br />BID <br />CONTRACT <br />AMOUNT <br />QUANTITY <br />THIS PAYMENT <br />QUANTITY <br />TO DATE <br />TOTAL <br />AMOUNT <br />SCHEDULE W. WATERMIAN IMPROVEMENTS <br />1 <br />MOBILIZATION <br />0.75 <br />LS <br />$7,906.91 <br />$5,930.18 <br />0.75 <br />$5,930.18 <br />2 <br />TRAFFIC CONTROL <br />0.75 <br />LS <br />$3,917A9 <br />$2,938.12 <br />0.75 <br />$2,938.12 <br />3 <br />REMOVE WATERMAIN PIPE AND FITTINGS <br />77 <br />LF <br />$3.01 <br />$231.77 <br />10 <br />$30.10 <br />4 <br />REMOVE HYDRANT <br />3 <br />EA <br />$187.47 <br />$562.41 <br />2 <br />2 <br />$374.94 <br />5 <br />REMOVE AND REPLACE CONCRETE CURB AND GUTTER <br />20 <br />LF <br />$33.48 <br />$669.60 <br />46 <br />$1,540.08 <br />6 <br />REMOVE BITUMINOUS OR CONCRETE PAVEMENT <br />87 <br />SY <br />$12.36 <br />$1,075.32 <br />49 <br />$605.64 <br />7 <br />14" WMN - HDPE, DR I I TRENCHLESS INSTALLATION <br />2040 <br />LF <br />$60.75 <br />$123,930.00 <br />2105 <br />$127,878.75 <br />8 <br />8"WMN-C900 <br />20 <br />LF <br />$22.75 <br />$455.00 <br />42 <br />$955.50 <br />9 <br />6"WMN-C900 <br />55 <br />LF <br />$19.60 <br />$7078.00 <br />35 <br />$686.001 <br />10 <br />12"-WMN -C900 <br />60 <br />LF <br />$31.10 <br />$1866.00 <br />50 <br />$1555.00 <br />11 <br />12"GVANDBOX <br />4 <br />EA <br />$2578.03 <br />$10312.12 <br />4 <br />$10312.12 <br />12 <br />8" GV AND BOX <br />2 <br />EA <br />$1.635.83 <br />$3,271.66 <br />3 <br />$4,907A9 <br />13 <br />6" GV AND BOX <br />5 <br />EA <br />$1,286.93 <br />$6434.65 <br />4 <br />$5147.72 <br />14 <br />WMN FITTINGS <br />1980 <br />PD <br />$4.85 <br />$9603.00 <br />3065 <br />$14,865.25 <br />15 <br />CONNECT TO EXISTING WMN <br />6 <br />EA <br />$1246.73 <br />$7480.38 <br />5 <br />$6,233.65 <br />16 <br />HYDRANT <br />3 <br />EA <br />$2,760.90 <br />$8,252.70 <br />3 <br />$8,262.70 <br />17 <br />ADJUST GV BOX <br />4 <br />EA <br />$145.05 <br />$580.20 <br />4 <br />4 <br />$580.20 <br />18 <br />SILT FENCE <br />425 <br />LF <br />$2.06 <br />$875.50 <br />157 <br />$323.42 <br />19 <br />HAUL AND PLACE AGGREGATE BASE CV <br />27 <br />CY <br />$20.60 <br />$556.20 <br />18 <br />$370.80 <br />20 <br />BITUMINOUS STREET PATCH <br />47 <br />SY <br />$67.02 <br />$3149.94 <br />54 <br />103 <br />$6,903.06 <br />21 <br />4" CONCRETE WALK <br />360 <br />SF <br />$5.41 <br />$1,947.60 <br />625 <br />$3,381.25 <br />22 <br />TOPSOIL BORROW CV <br />50 <br />I CY <br />1 $21.07 <br />$1.053.50 <br />0 <br />$0.00 <br />23 <br />TURF ESTABLISHMENT -WATERMAIN <br />1.00 <br />1 LS <br />1 $2018.80 <br />$2018.80 <br />1 1 <br />7 <br />$2,018.80 <br />SCHEDULE "A" - SUBTOTAL <br />Total Did <br />$104,272.65 <br />Wank ro mte <br />$205,790.77 <br />SCHEDULE'S" - TRAIL WIPROVEMNTS <br />1 <br />MOBILIZATION <br />0.25 <br />LS <br />$12146.44 <br />$3036.61 <br />0.25 <br />$3,036.61 <br />2 <br />TRAFFIC CONTROL <br />0.25 <br />LS <br />$4,741.16 <br />$1,185.29 <br />_ <br />0.25 <br />$1,185.29 <br />3 <br />REMOVE AND REPLACE CONCRETE CURB AND GUTTER <br />25 <br />LF <br />$33.48 <br />$837.00 <br />-3.4 <br />26.6 <br />$890.57 <br />4 <br />REMOVE BITUMINOUS OR CONCRETE PAVEMENT <br />91 <br />SY <br />$12.36 <br />$1,124.76 <br />91 <br />$1,124.76 <br />5 <br />CLEAR AND GRUB TREE <br />16 <br />EA <br />$450.63 <br />$7,210.08 <br />20 <br />$9,012.60 <br />6 <br />ADJUST MH CASTING MnDOT 2506.522 <br />5 <br />EA <br />$145.06 <br />$725.30 <br />5 <br />$725.30 <br />7 <br />RECONSTRUCT MH MnDOT 2506.503 <br />1.5 <br />LF <br />$556.76 <br />$835.14 <br />0 <br />$0.00 <br />8 <br />COMMON EXCAVATION P EV <br />804 <br />CY <br />$14.83 <br />$11,923.32 <br />804 <br />$11,923.32 <br />9 <br />HAULAND PLACE AGGREGATE BASE C <br />343 <br />CY <br />$11.11 <br />$3810.73 <br />343 <br />$3810.73 <br />10 <br />TYPE LV4 BITUMINOUS MIXTURE FOR TRAIL <br />172 <br />TON <br />$89.70 <br />$15,428.40 <br />187.49 <br />$16,817.85 <br />11 <br />BITUMINOUS STREET PATCH <br />3 <br />SY <br />$67.02 <br />$201.06 <br />0 <br />1 $0.00 <br />12 <br />7"CONCRETE DRIVEWAY APROWPED RAMP <br />20 <br />SY <br />$60.26 <br />$1205.20 <br />0.5 <br />20.5 <br />$1235.33 <br />13 <br />4" CONCRETE WALK <br />475 <br />SF <br />$4.89 <br />$2,322.75 <br />712 <br />1187 <br />$5.804.43 <br />14 <br />TRUNCATED DOMES <br />16 <br />SF <br />$41.24 <br />$659.84 <br />16 <br />$659.84 <br />15 <br />SILT FENCE <br />1140 <br />LF <br />$1.75 <br />$1995.00 <br />1140 <br />$1995.00 <br />16 <br />INLET PROTECTION <br />1 <br />EA <br />$103.00 <br />$103.00 <br />1 <br />$103.00 <br />17 <br />18 <br />TOPSOIL BORROW CV _ <br />TURF ESTABLISHMENT -TRAIL <br />232 <br />1.00 <br />CY <br />LS <br />$21.07 <br />$4274.50 <br />$4888.24 <br />$4274.50 <br />485 <br />1 <br />485 <br />i <br />$9797.55 <br />$4,274.50 <br />19 <br />FURNISH AND INSTALL SIGN <br />5 <br />EA <br />$180.25 <br />$901.25 <br />3 <br />3 <br />$540.75 <br />SCHEDULE "B" -SUBTOTAL <br />Taal BW <br />$62467.47 <br />Work dH <br />$72,937.43 <br />CHANGE ORDER'S <br />1 <br />CONNECT WATER SEVICE AT HOTEL PARKING LOT <br />$9,848.38 <br />2 <br />CUT F0 RIC CUT STEEL CASINGS AND CAP <br />$1,981.00 <br />TOTAL CHANGE ORDERS <br />TOTAL OF WORK TO DATE <br />LESS RETAINAGE (0%) <br />SUB -TOTAL <br />LESS PREVIOUS PAYMENTS <br />TOTAL OF FINAL PAYMENT <br />$11,829.38 <br />$290,557.58 <br />$0.00 <br />$290,557.58 <br />$250,774.14 <br />$39.783.44 <br />