My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2010
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 2010
>
07-27-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 11:03:26 AM
Creation date
8/23/2010 2:50:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 27, 2010 Page 2 of 5 <br />Consent Agenda <br />1. Consolidated Vouchers 132154 through 132315 for a grand total of 479,757.78. <br />Report No.10-173. <br />' 2. Purchasing card statement for month ofJune 2010, totaling $18,875.52. ReportNo. 10-174. <br />3. Consideration of Increase in Firefighter Relief Association Benefit Level. Report No. 10-175. <br />Resolution No. 10-044. <br />4. Consideration ofReimbtnsernent to Ryan Companies for 2002 AUAR Preparation Report No. <br />10-176. <br />5. Consideration of Starmwater Management Facilities Maintenance Agreement for Project 10-1, <br />2010 Sheet Rehabilitation Report No. 10-177. <br />Motion by Councilmember Phillips, seconded by Councilmember Samuelson to <br />approve the consent agenda as amended; noting item number 3 (Consideration oflncrease <br />in FrrefighterReliefAssociation Benefit Level.) include the recent retirees. <br />5 Ayes, 0 Nays -Motion Carried <br />I <br />Public Hearing <br />1. Public Improvernent Hearing to Consider Project 10-15, 7th Sheet Sidewalk Between 23rd <br />Avenue NW and Inca Lane. Report No. 10.178. Resolution No. 10-047. <br />Craig Sdilichting, Civil Engineer Il gave a brief history on the project A neighborhood meeting was held on <br />Thursday, July 1, 2010, most residents present at the meeting were not in favor of a sidewalk project. <br />However, most were in favor of the installation of a new crosswalk at Inca Lane. Residents expressed <br />concern with the current crosswalk located at 23 d Ave NW and 7d, Street NW, as it causes congestion <br />with busses and vehicle traffic. At the July 13, 2010, council meeting the City Council accepted the <br />Feasibility Study for Project 10-15 and set the Public Improvement Hearing for July 27, 2010. Photos <br />were displayed indicated present conditions as well as proposed improvements. City staff conducted an <br />analysis, on three different school days counting the number of students crossing 7" street. <br />Constriction options were explained between the sidewalk construction, or the installation ofa crosswalk at Inca Lane <br />on7e StNW.The crosswalk cptionis stibstantially less expensrve,,arithan estimated cost of $4,830.00, as compared to <br />the sidewalk estimate of $22,295.00, MSA funds would be used for the project Staffrecormnendation is to approve the <br />crosswalk option. <br />Colurciln�emberPhillips questioned ifitwould bebeneficial torelocate the crosswalklocated at23"Ave? Mr. <br />Schlichtiing suggested the tendency may be to continue to cross at 23d, as there is a school enhance there. <br />Councilmember Burg questioned why a croswralk was recommended overa sidewalk9 Srhlirhtingnepliedacrosswalk <br />seems to be good solution fora couple ofreasons, including the 20 mph school zone, along with the fact that pedestrians <br />are crossing a two lane mad. Councilmember Bauman likes the crosswalk option, and noted it may encourage kids to <br />cross at Inca lane instead ofcrossmg at random points. <br />'Councilmember Samuelson suggested proceeding with the crosswalk, with the option to review at a fiaure date to erisme <br />safety. Councilmember Burg suggested reviewing the pedestrian traffic inthe whiter. <br />Director Wyffels suggested the School Resource Officer at Highview Middle Schoolwork with the students to educate <br />them on the crosswalk procedures. <br />Consent Aeende <br />1. CmsoWated <br />Vouchers 132154dnougb <br />132315 for agmdW of <br />$479,757.78. Repat Na <br />10-173. <br />2 Pudravng <br />card ShAene t formonti of <br />Ju e2010,totafnig <br />$18,87552. RgxdNc, 10- <br />174. <br />3. Cm9daataiof <br />InaraseinFmrbghtErRelef <br />Associ tbm Benefit Ick. <br />Re)atNa 10-175. <br />4. Cmsdaubon of <br />RetnabxscrneittoRymr <br />Co npmries for2002 <br />AUARPrWaratiar. <br />RepatNo, 10-176. <br />5. CamdeaGon of <br />Sainnwutermwag=Cot <br />FaalitisManumm ce <br />Aaeernern forPmjaY 10-1, <br />2010Sftd Rdiabli on. <br />RepatNa 10-17. <br />Public Hearine <br />I Public Hearing Do <br />caisderprojea 10-15 <br />RepatNo. 10-178. <br />Resolution No. 10047 <br />
The URL can be used to link to this page
Your browser does not support the video tag.