Laserfiche WebLink
• approve or deny applicants based on program guidelines and inform applicant of ability to <br />appeal the decision to the City <br />• determine ability of applicant to perform work for sweat equity improvements <br />• close loans at CEE offices or other designated location in the City <br />• close loans at the residences of elderly or handicapped individuals who cannot travel to CEE <br />offices or community sites <br />• disburse proceeds to the contractor/borrower upon receipt of the following: _ <br />• final invoice or proposal <br />• completion certificate <br />• signed copies of required building permits (if applicable) <br />• final inspections verification <br />• lien waiver <br />• manage the Loan fund and provide the City with periodic reports <br />• submit other reports and information as may be required by the City <br />PageA-6 Proposal for City of New Brighton <br />Center for Energy and Environment <br />