My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-22-2011
NewBrighton
>
Council
>
Packets
>
2011
>
CCP 02-22-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 8:00:43 PM
Creation date
2/18/2011 4:21:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
...,, <br /> ,,,,,,i <br /> !sAIA Document G7021CMaTM - 1992 ;SRN o 7 2011 <br /> 20406 <br /> Application and Certificate for Payment Construction Manager-Adviser Edition <br /> TO OWNER: CITY OF NEW BRIGHTON PROJECT: FAMILY SERVICE CENTER APPLICATION NO; 3 Distribution to: <br /> 803 OLD HIGHWAY 8 NW 400 - 10TH ST NW PERIOD TO: 01/05/11 OWNER 0 <br /> NEW BRIGHTON, MN 55112 <br /> NEW BRIGHTON MN 55112 RR-BUR 385 SOS CONSTRUCTION MANAGER ❑ <br /> FROM CONTRACTOR: McPhillips Bros. RoofingVA•CONSTRUCTION MAMA:INC CONTRACT DATE: 05/17/1D ARCHITECT 0 <br /> 2590 Centennial Drive 5801 DULUTH ST PROJECT NOS: / / CONTRACTOR 0 <br /> St Paul, MN 55109 <br /> VIA ARCHITECT: MINNEAPOLIS MN 55422 FIELD ❑ <br /> CONTRACT FOR: ❑ <br /> CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,information and <br /> Application is made for payment,as shown below,in connection with the Contract. belief the Work covered by this Application for Payment has been completed in accordance with the <br /> Continuation Sheet,AIA Document G703,is attached. Contract Documents,that all amounts have been paid by the Contractor for Work for which previous <br /> Certificates for Payment were issued and payments received from the Owner, and that current <br /> 1.ORIGINAL CONTRACT SUM $ 540,000.0D payment shown herein is now due. <br /> 2.Net change by Change Orders $ ou CONTRACTO <br /> 3.CONTRACT SUM TO DATE(Line I ±2) $ B : ,J.t;'(-C XA.GC,*4L� S I s4s.000.00 Y Date: J� —U - t � <br /> 4.TOTAL COMPLETED&STORED TO DATE(Column G on G703) $ 548,000.00 State of: h0 I,..j .u- -r 1r� <br /> ,�'44'Q KIMBERLY J.PLEAU <br /> 5.RETAINAGE: County of: r ! <br /> a. 0610 of Completed Work `0.m � v NOTARY PUBLIC-MINNESOTA <br /> Subscribed and sworn to before i My Commission Expires Jan.31,2015 <br /> (Column D+Eon G703) $ .00 me this �41— y of . .G�,n�xvh`i o: — <br /> b. .o1%of Stored Material Notary Public: 1 . <br /> (Column F on G703) $ .oo My Commission expires: b\ — ;jy)j 4 U/1 <br /> Total Retainage(Lines 5a+5b or Total in Column I of G703). $ .no CERTIFICATE FOR PAYMENT <br /> In accordance with the Contract Documents, based on on-site observations and the data comprising <br /> 6.TOTAL EARNED LESS RETAINAGE $ <br /> saa,coo on this application,the Construction Manager and Architect certify to the Owner that to the hest of their <br /> (Line 4 Less Line 5 Total) knowledge,information and belief the Work has progressed as indicated,the quality of the Work is in <br /> 7.LESS PREVIOUS CERTIFICATES FOR PAYMENT $ accordance with the Contract Documents,and the Contractor is entitled to payment of the AMOUNT <br /> 52°.6o0.OG CERTIFIED. <br /> (Line 6 from prior Certificate) ^� 00 <br /> 8.CURRENT PAYMENT DUE $ 2i Q„o and AMOUNT CERTIFIED $ t 4c. , <br /> 9.BALANCE TO FINISH,INCLUDING RETAINAGE (Attach explanation if amount certified differs the amount applied. Initial all,figures on this <br /> Application and on the Continuation Sheer that are changed to conform with The amount certified) <br /> (Line 3 less Line 6) $ .oo CONSTRUCTION MANAGER: <br /> By: Date: <br /> CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS ARCHIT • <br /> Total changes approved in previous months by Owner $ oo $ oo By: Date: 1 I I <br /> Total approved this Month $ as $ n0 This Celt c e is not negotiable. The AMOUNT CERTIFIED is payabl only to the Contractor <br /> TOTALS $ nn $ nn named herein.Issuance,payment and acceptance of payment are without prejudice to any rights of <br /> NET CHANGES by Change Order $ 00 the Owner or Contractor under this Contract. <br /> CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes will not be obscurca. <br /> AIA Document G702/CMan,-1992.Copyright CI 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIA''Document is protected by U.S.Copyright Law and International Treaties. <br /> Unauthorized reproduction or distribution of this AIA' Document,or any portion of it,may result In severe civil and criminal penalties,and wln be prosecuted to the maximum extent possible under the law. <br /> Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.