My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-22-2011
NewBrighton
>
Council
>
Packets
>
2011
>
CCP 02-22-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 8:00:43 PM
Creation date
2/18/2011 4:21:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 8,2011 Page 4 of 6 <br /> Motion by Councilmember Burg,seconded by Councihnember Phillips to adopt the Resolution <br /> ordering Project 10-10, Old Highway 8 NW Sidewalk as proposed in the feasibility study, <br /> authorize staff to proceed with the preparation of the plans and specifications and <br /> designate the City Engineer as the engineer for this improvement, with the following <br /> conditions: <br /> 1. Such improvement is hereby ordered as proposed. <br /> 2. The City Engineer is hereby designated as the engineer for this improvement and is hereby <br /> authorized to proceed with the preparation of the plans and specifications. <br /> 3. City Staff is authorized to prepare a Feasibility Study for the southerly build out of the trail <br /> along the east side of Old Highway 8 as State Aid funding becomes available. <br /> 5 Ayes,0 Nays,Motion Carried <br /> Council Business <br /> 1. Consideration for Goose Management Practices. Report No. 11-057. Council Business <br /> 1.Consideration for <br /> Director of Parks and Recreation SandyBreuergave the followingbackground information GooseiManagement <br /> g Practices. <br /> regarding Report No. 11-057 <br /> The goose management discussions so far: <br /> June—Council received petition <br /> June—Council directed PREC to study issue <br /> November—Goose management speakers(5) <br /> December—PREC develops recommendation <br /> February—PREC redefines recommendation <br /> In 1985 Goose removal started in New Brighton with a budgeted expense of$3,000/Parks&1,000/BWH. <br /> The average cost over the last 5 years has been$2500;with an annual average of 69 geese removed. It was <br /> noted the goose is a federally protected bird. PREC recommendation is that New Brighton continue with its <br /> current program with the following addendums: <br /> 1)Limit goose management to public land. <br /> 2)Develop alternative methods of goose removal such as egg addling. <br /> 3)Increase public education regarding goose management. <br /> John Taft reported he and his wife were very concerned with the City's prior Goose Management strategies, <br /> and has been looking for more humane less costly options. Mr.Taft noted The State Veterinarian has indicated <br /> there is no data to constitute goose droppings as hazardous. Mr.Taft also stated his opinion that it is financially <br /> does not make sense to treat private property. <br /> Councilmember Bauman reported she has noted through research that there can be negative health effects <br /> associated with geese. Councilmember Bauman stated she does not feel rounding up geese is inhumane,as the <br /> meat is donated to a food shelter. Councilmember Bauman noted addling is a good solution for all. <br /> Motion by Councilmember Phillips seconded by Councilmember Bauman to direct staff to: <br /> • Develop an egg addling program and implement in Spring 2011. <br /> • Direct staff to develop a goose management education program,including the City <br /> Website,and notification of affected owners. <br /> • Staff be directed to conduct a goose survey,bringing back any further recommendations <br /> • Direct PREC to revisit the issue at the conclusion of the 2011 season to review effectiveness <br /> and make any further recommendations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.