Laserfiche WebLink
Now <br />a Si <br />the'. <br />1. ' <br />That adequate utilities, access roads, drainage and/or necessary facilities have been or are <br />being provided. <br />That the special use shall in all other respects conform to the applicable regulations of the <br />district in which it is located. <br />Planning Commission and City Council found the criteria of Section 8-130 are met given <br />following findings: <br />The library is an appropriate use for the B-4 district and for the New Brighton <br />Community Center. <br />The development standards proposed for the addition, such as setbacks, building height, <br />FAR, building parking, etc. are consistent with other commercial development in the <br />City. <br />Parking lot improvements will ensure that introduction of the library use will not <br />negatively impact users of the site. <br />The shared parking arrangement and likely sharing of customers should ensure the site is <br />adequately parked. <br />Pedestrian access improvements will provide better pedestrian access to and from the <br />site. <br />Adequate access to utilities, roads, and drainage is provided. <br />1EREFORE BE IT RESOLVED, that based upon the above findings of fact the application for <br />Plan (LP2011-001) and Special Use Permit (SP2011-005) are hereby approved, subject to <br />lowing conditions: <br />e 55 stall overflow parking area expansion and drive -aisle connection is built as soon as <br />2. e 12 stall angled parking around the north side of the building shall be designated as <br />��khoof-of-parking and will be constructed in the future if necessary at the city's expense. <br />3. a east entrance concrete and curbing improvements are redesigned to meet current ADA <br />ndards. <br />4. lice <br />msey County shall coordinate construction of the drive -up book drop with engineering <br />ff to ensure existing down spouts and catch basins in the area are not negatively <br />pacted and/or relocated as necessary. <br />5.pre-construction meeting is coordinated with City staff to discuss designated areas for <br />rage of construction materials and ensuring access routes are maintained for emergency <br />hicles and use of all existing parking stalls. <br />6.sidewalk is constructed from the intersection of 10`" ST NW & Old Highway 8 NW <br />ecifically from the NE corner) east along the northern side of 10`" ST NW ending at the <br />st side of the 10ih ST NW entrance to the overflow parking lot at the city's expense. <br />7. Creek Watershed District (RCWD) permits are obtained and submitted for City staff <br />8. evices shall be utilized in the "new planted area" as depicted on the Landscape Plan to <br />event an automobile from traveling through the glass striking building occupants. A <br />ore detailed Landscape Plan incorporating these physical devices, in addition to <br />plementation of low maintenance turf and/or prairie grasses is submitted to Parks and <br />blic Safety staffs for approval at the time of building permit. <br />9. fire suppression evaluation is completed and submitted to the Fire Marshal for review to <br />sure adequate fire sprinkler density for the changing building conditions. <br />10. a pedestrian access through the wooded area from the overflow parking lot is widened <br />d better lit to improve pedestrian safety through this corridor. This effort shall be <br />viewed and approved by Public Safety and be the city's responsibility to complete. <br />11.ny signage erected on site shall comply with the Civic Campus Comprehensive Sign <br />an, last updated and approved on August 25, 2009. <br />and Settings\kbrunoTocal Settings�Temporary Internet FiW0LK736V.P2011-001 MOI I-005 (Ramsey County) - <br />7.doc 2 <br />