My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-13-2011
NewBrighton
>
Council
>
Packets
>
2011
>
CCP 06-13-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 10:42:37 PM
Creation date
6/10/2011 3:24:59 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE AID FOR LOCAL TRANSPORTATION June 2008 <br /> WORK ORDER FOR MINOR EXTRA WORK Page 1 of 2 <br /> City/County of 147-New Brighton Work Order No. 5 <br /> FEDERAL PROJECT NO STATE AID PROJECT NO. LOCAL PROJECT NO. CONTRACT NO. <br /> SRTS 6210(097) 147-591-04 08-7 <br /> CONTRACTOR NAME ADDRESS CITY STATE ZIP <br /> SUNRAM CONSTRUCTION 20010 75TH AVENUE NORTH CORCORAN MN 55340 <br /> LOCATION OF WORK: TOTAL WORK uKutK AMOUNT <br /> HANSEN PARK TRAIL(STORM CROSSINGS) $2,850.00 <br /> In accordance with the terms of this Contract, you are hereby authorized and instructed <br /> to perform the work as altered by the following provisions. <br /> During construction, the proposed 12" PVC storm crossings were installed without flared <br /> end sections. The contractor was instructed to install 12" metal aprons to blend with the <br /> proposed slope. Prior to paving several softspots were encountered. The contractor <br /> was instructed to remove the existing Class 7 and install additional material as required <br /> to prepare for final pavement. <br /> In accordance with Mn/DOT Specification 1403, the Engineer issues this Work Order to <br /> install the 12" metal aprons and provide 5 loads of compacted Class 7 in accordance <br /> with all applicable specifications and as directed by the project supervisor. <br /> Payment for this work will be made at the negotiated unit prices shown below. <br /> This work is not expected to become, or affect the Controlling operation. Contract time <br /> will not be altered as a result of this work except as provided in Mn/DOT Specification <br /> 1806. <br /> COST BREAKDOWN <br /> Group/ <br /> *Fund Cat. Item No. Description Unit Unit Price Quantity Amount <br /> 1 2211.604 9" PLACED AGG. BASE CL. 7 LOAD $250 5 $1,250.00 <br /> 1 2501.515 12" METAL PIPE APRON EA $400 4 $1,600.00 <br /> *Group/Funding category is required for federal projects. <br /> E <br /> by I Approved by <br /> 7 /�,,, Contractor: <br /> Print Name: Gar �`'I• "`31 0 Print Name: <br /> Date: (p/1 1 I ) Phone: (csi')cam-z Date: Phone: <br /> Original to Protect Engineer; Copy to Contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.