My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-14-2012
NewBrighton
>
Council
>
Packets
>
2012
>
CCP 02-14-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 7:29:04 PM
Creation date
2/10/2012 1:10:56 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> Well Maintenance Quotes <br /> February 9,2012 <br /> A well drawdown transducer will also be installed in Well 12 to measure the aquifer water level automatically. <br /> This information is reported to the Minnesota Department of Natural resources each year as part of our water <br /> appropriation permit to pump waters of the state. The current drawdown measurement is done with a manually <br /> read air line. With each well maintenance period, these air lines need to be replaced. The drawdown transducer <br /> will last longer, be more accurate and not require an operator to be in the well house to take the water level <br /> reading. <br /> All work shall be completed prior to May 1,2012. <br /> Costs and Funding: The cost for the maintenance work on Well 5 will be paid from the Army 20 year operation <br /> and maintenance fund. The cost for the maintenance work and installation of drawdown transducers on Well 12 <br /> will be paid from the Water Utility fund. <br /> /6.) <br /> Grant Wyffels <br /> Director of Public orks <br /> AttachmentâBid Tabulations Wells 5 and 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.