My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#78 8-26--97-184
NewBrighton
>
Council
>
Packets
>
1997 - 1999 AGENDA REPORTS
>
#78 8-26--97-184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 5:32:17 PM
Creation date
5/2/2012 9:28:28 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> To insure that no future filling or building structures are placed in the low area between Kari Lane and 16th Avenue NW, we <br /> are recommending that, as a condition of the project,the residents sign a declaration of covenant over that portion of their lots <br /> dipw elevation 870.0,which is the elevation of the lowest walkout basement. As explained in the Barr Engineering <br /> pplemental Report,the low area between Kari Lane and 16th Avenue NW is dependent upon a flap gate to prevent backup <br /> from Long Lake Road. Local drainage from the interior of the Kari Lane and 16th Avenue block cannot drain out until after <br /> the storm has passed and Long Lake Road has emptied. Therefore,the local drainage must be temporarily stored in the low <br /> area. Any filling or structures built in the low area would result in higher water levels which could again lead to flooding of <br /> the low homes. <br /> PROJECT COST ESTIMATE AND PROPOSED FUNDING <br /> The Total estimated cost of the recommended option, including engineering and contingencies, is$256,600. We are pursuing <br /> two possible sources to pay for the project and proposing a fall back funding plan if they are unsuccessful. The first possible <br /> source is a Hazard Mitigation Grant Program (HMGP)through the Minnesota Department of Public Safety. Approximately <br /> $1,300,000 is available under this program. We have submitted a preliminary HMGP application and along with the cities of <br /> St.Anthony, St. Paul and Minneapolis,have been notified that we are eligible to submit a final application. <br /> The second possible option would be State funding through special legislation. The City of St.Paul is seeking special <br /> legislation for State funding to pay for a similar flooding problem in St. Paul. Matt will be talking to Senator Novak about the <br /> possibility of getting our New Brighton project included in this special legislation. <br /> The fall back funding plan would include a combination of the City Storm Water Utility fund and City and County State Aid <br /> funds. Ramsey County does not have a fund source available for this project other than their State Aid Road funds. A check <br /> with the Office of State Aid indicated that County and City State Aid funds could be utilized for up to 55 percent of the total <br /> project cost. An exact breakdown of the 55 percent between City State Aid and County State Aid is not available at this time <br /> !I <br /> t is assumed that the majority could be from County State Aid. The remaining 45 percent is proposed to be paid from the <br /> t <br /> Storm Water Utility fund. <br /> Total Project Cost $256,600 <br /> 55% - City and County State Aid Funds $141,100 <br /> 45% - City Storm Water Utility Fund $115,500 <br /> We are recommending that Barr Engineering Company be retained to prepare the plans and specifications due to their <br /> familiarity with the project. City staff would provide the contract administration and Ramsey County staff would provide <br /> construction supervision. <br /> PROPOSED SCHEDULE <br /> The recommended schedule for the project is as follows: <br /> April 1998 -Present final plans and specifications to Council for approval and authorization to advertise for bids <br /> May 1998 - Award Bid and begin construction <br /> July 1998 - Substantial Completion of Project <br /> • <br /> 1 lENGI NEER\ENG1-97-CC\REPORTS\KARIF RPT.WPO <br />
The URL can be used to link to this page
Your browser does not support the video tag.