My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#78 8-26--97-184
NewBrighton
>
Council
>
Packets
>
1997 - 1999 AGENDA REPORTS
>
#78 8-26--97-184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 5:32:17 PM
Creation date
5/2/2012 9:28:28 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> The total estimated cost for this project including the easement cost and engineering and contingencies is $390,258. The <br /> project is proposed to be funded from the following sources: <br /> 111, <br /> Total Project Cost including Easement Cost and Engineering and Contingencies $390,258 <br /> MacGillis and Gibbs Land Sale Proceeds $177,890 <br /> Hypro Corporation $ 25,770 <br /> City Storm Water Utility Fund $ 93,299 <br /> Tax Increment Financing $ 93,299 <br /> We are proposing a bid opening date of January 20, 1998,with bids presented to Council for consideration of an award at the <br /> January 27, 1998,Council meeting. Construction would begin in February and the project would be substantially complete by <br /> May 1998. <br /> • <br /> I <br /> LIENGINEERIENG-97-CCIREP 0 RTSIBCPCNTR 1.WPD <br />
The URL can be used to link to this page
Your browser does not support the video tag.