My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-08-2012
NewBrighton
>
Council
>
Packets
>
2012
>
CCP 05-08-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 9:03:15 PM
Creation date
5/4/2012 12:58:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 24,2012 Page 6 of 11 <br /> 2. Consideration to Authorize Ci Pro ect 12-9 Phase 1 Freedom Park Flood Miti ation 2'Consideration to <br /> tY J , g Authorize CityProject 12- <br /> Improvements. Report No. 12-097. 9,Phase 1 Freedom Park <br /> Flood Mitigation <br /> City Manager Lotter reported that as a result from the July 16th rain event,the Freedom Park/Pike Lake O° e"ts' Report <br /> No.12-097 <br /> Drive neighborhood approached the City for assistance. City Staff organized two informational meetings <br /> with the community affected,as well as discussing at the Neighborhood Meetings in February. <br /> Director Wyffels gave an overview of the proposed project,reporting that if the project is approved, <br /> construction could start in August 2012,with completion likely November 2012. <br /> Director Wyffels showed photos and a few videos from the July 16th event to provide the Council an <br /> opportunity to see what happened in various areas throughout the city. <br /> Director Wyffels explained that there are two options for improvements: <br /> • Increase upstream storage(bigger tub). <br /> • Increase capacity of conveyance system(bigger drain). <br /> Five possible options were considered;the following option is being recommended: <br /> Construct Surge Basin in Freedom Park—This option includes construction of a surge basin south <br /> and west of the existing ball field. <br /> Construct Additional Catch Basins on Pike Lake Drive-This option includes construction of <br /> additional catch basins along Pike Lake Drive at Fredeen Court and 12th Street. <br /> Hydrologic and Hydraulic Modeling,Soil Testing—This project will require additional professional <br /> services. See the explanation below. <br /> The total estimated project cost is $272,800. Mayor Jacobsen questioned if there is money in the <br /> budget. Director Wyffels confirmed that there is money in the Capital Improvement Plan, <br /> noting some projects will need to be reprioritized. <br /> Councilmember Burg questioned if the proposed changes to Freedom Park will have any impact on the park, <br /> and whether this plan has been reviewed by the PREC commission. Director Wyffels stated that the football <br /> field and track would not be affected. Wyffels stated that he has shared the proposed project with the PREC <br /> commission. It was explained that this will be a dry pond 99%of the time. <br /> Councilmember Bauman asked if this will solve the problems experienced this summer. Director Wyffels <br /> stated that in the near term it would provide more assurance.Mr.Hubmer stated that he hesitates to use the <br /> term"solve",but did note research indicates that this would provide protection during significant rain events. <br /> Mayor Jacobsen asked if the channel from Pike Lake to Long Lake will be able to accommodate an increased <br /> capacity. Director Wyffels reported that the channel will be cleaned up in the future;as part of a larger study. <br /> Councilmember Burg stated that Freedom Park was redesigned 10-12 years ago,noting that that drainage is <br /> still not adequate,and asked if the Parks Department has the ability to look at and possibly repair the field. <br /> Director Wyffels said he will talk to the Parks Department and look into mitigating some of the drainage <br /> problems on the field. <br /> Motion by Councilmember Burg seconded by Councilmember Bauman to order City Project 12-9, <br /> Phase 1 Freedom Park Flood Mitigation Improvements as proposed in the July 2011 Flood <br /> Investigation and Stormwater Modeling Report(Flood Report)dated April 17,2012 prepared by <br /> WSB&Associates. Phase 1 Improvements include constructing Options B4&B5 of the Flood <br /> Report.And authorize staff to proceed with the preparation of the plans and specifications and <br /> designate the City Engineer as the engineer for this improvement. <br /> 5 Ayes,0 Nays-Motion Carried <br />
The URL can be used to link to this page
Your browser does not support the video tag.