My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-22-2012
NewBrighton
>
Council
>
Packets
>
2012
>
CCP 05-22-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 10:03:22 PM
Creation date
5/18/2012 2:32:34 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C Report Number 12-122 <br /> BRIGHTON itAl�� Agenda Section VI-4 <br /> Council MeetingDate May22, 2012 <br /> the city that works for you <br /> REQUEST FOR COUNCIL CONSIDERATION <br /> ITEM DESCRIPTION: CONSIDERATION OF QUOTES AND AWARD A CONTRACT FOR <br /> CITY PROJECT 12-3, TENNIS COURT REHABILITATION <br /> DEPARTMENT HEAD'S APPROVAL: (inw <br /> CITY MANAGER'S APPROVAL: <br /> No comments to supplement this report Comments attached <br /> Recommendation: Accept the quotes award a contract for City Project 12-3, Tennis Court <br /> Rehabilitation to Upper Midwest Athletic Construction for the Alternate Quote of $42,128, plus an <br /> additional amount of$8,256 for Armor Crack Repair at all courts for a total amount of$50,384. <br /> Legislative History: On April 4, 2012, staff presented the project to the Parks, Recreation & <br /> Environmental Commission(PREC). <br /> Financial Impact: The following three quotes were received for this project on May 14, 2012: <br /> Base Quote with Standard Alternate Total Quote with 800 <br /> Crack Repair and Single LF of Armor Crack Repair and <br /> Court Color Dual Colored Court <br /> Upper Midwest Athletic $31,800 $42,128 <br /> Construction <br /> Lee Sport Surfacing LLC $36,520 $49,520 <br /> Court Surfaces and Repair $37,200 $55,100 <br /> The engineer's estimate for this project was $45,000. A tabulation of the quotes has been completed <br /> by the Engineering Department and is attached to this report. The lowest quote submitted by Upper <br /> Midwest Athletic Construction, has not done work for the City in the past, but has done similar work in <br /> other communities, and is qualified and capable of performing work of this kind and magnitude. <br /> If awarded,work is anticipated to start June 4, 2012 and will be completed by August 10, 2012. <br /> Explanation: The City of New Brighton is requested quotations for the rehabilitation for all 8 of our <br /> tennis courts at the following locations: <br /> Hansen Park 1555 5th Street NW 2 courts Built 1992 <br /> Silver Oaks Park 1550 29th Avenue NW 1 court Built 1999 <br /> Freedom Park 2121 14th Street NW 2 courts Built 1983 <br /> Hidden Oaks Park 340 Oakwood Drive 2 courts Built 1983 <br /> Totem Pole Park 1111 Foss Road 1 court Built 1983 <br /> This project will consist of cleaning, crack repair, resurfacing and re-striping all 8 tennis courts. Due to <br /> lack of funding,the courts have not been reconditioned since they were originally built. All of the courts <br /> are in need of repair. City staff will remove and replace existing nets/supports as needed prior to <br /> resurfacing. The Freedom and Hidden Oaks courts have concrete panels in the center that have heaved, <br /> creating an uneven playing surface. These will be removed and restored with asphalt by City staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.