Page 2 of 2 <br /> Council Report <br /> 12-3, Tennis Court Rehabilitation <br /> At the April PREC meeting, it was recommended to staff that we include the removal of existing <br /> vegetation/bushes at Freedom and Silver Oaks Parks (this was also recommended by the contractor). <br /> The current vegetation drops debris, provides hidden areas for potential trouble, and shade that ultimately <br /> does not allow the court to dry as fast(causing mold/mildew to form). <br /> The PREC also recommended quoting the project with dual colors if the prices were not largely impacted. <br /> The color combination selected by PREC is a light green court with a dark green border. <br /> The existing cracks on each of the courts except for Silver Oaks are large enough that the standard crack <br /> patch binder will not promote a long-term smooth playing surface. Silver Oaks is a newer court and does <br /> not have any significant cracks. The quotes included two different options for repairing the cracks that <br /> have formed on the playing surfaces. The first option is to fill all of the cracks (1,440 linear feet) with a <br /> standard crack patch binder, but this repair will be temporary, lasting only 1-3 years. The second option <br /> is to fill the cracks on Hansen and Freedom courts with an Armor Crack Repair system (800 linear feet), <br /> and fill the remaining cracks (640 linear feet)at the other courts with a standard crack patch binder, since <br /> these courts are less used. The Armor Crack Repair system is expensive, but expected to last 10 years. <br /> Staff is recommending we accept the alternate quote to use the Armor Crack Repair system and further, <br /> extend the use of this system to the Hidden Oaks and Totem courts as well, given the competitive pricing <br /> provided by the contractor. This will cost an additional $8,256, but when all of the courts are finished, <br /> they will be in an as-new condition. <br /> It is expected the scheduled repairs will allow the courts to last until 2022 when they are scheduled for <br /> full replacement. <br /> Costs and Funding: The total cost of this project will be funded from Fund 606,Pavement Management <br /> Fund, and any tree/shrub removals will be funded from Forestry General Fund. <br /> Grant M. yffels, P. . <br /> Director of Public Works <br /> Attachments: <br /> Quote Tabulations <br /> Location Map <br />