Laserfiche WebLink
Quote Tabulations Project 12-3 Tennis Court Rehabilitation <br /> 1 2 3 <br /> Est. Upper Midwest Athletic Construction Lee Sport Surfacing LLC Court Surfaces&Repair, Inc. <br /> ITEM Quantity Unit Unit Price Total Unit Price Total Unit Price Total <br /> Surface Preparation 1 L.S. S7,480.00 $7,480.00 $8.000.00 S8,000.00 *N/A 'N/A <br /> Repair Cracks with Crack Patch Binder 1440 L.F. S3.00 $4,320.00 S1.75 S2.520.00 *N/A 'N/A <br /> Resurface and Color Coat 1 L.S. $16,000.00 S16,000.00 $22.000.00 S22,000.00 S37.200.00 S37.200.00 <br /> Re-stripe Courts 1 L.S. $4,000.00 S4.000.00 S4,000.00 $4,000.00 *N/A 'N/A <br /> BASE QUOTE TOTAL S31,800.00 S36,520.00 $37,200.00 <br /> ALTERNATIVE QUOTE ITEMS <br /> Install Armor Crack Repair System(in addition to Base Quote) 800 L.F. S15.90 $12,720.00 $18.00 S14,400.00 $19.50 $15.600.00 <br /> Dual Colored Court 1 L.S. $8.00 $8.00 'N/A S39,500.00 S39.500.00 <br /> Deduct 800 1. Crack Patch Binder S3 CO :. 2-00 00 Si75 <br /> ADJUSTED TOTAL INCLUDING ALTERNATE ITEMS $42,128.00 $49,520.00 $55,100.00 <br /> *N/A Included in Base Quote Total <br /> Quotes received May 14,2012 <br />