Laserfiche WebLink
resourceful. naturally. BARR <br /> engineering and environmental consultants <br /> July 27, 2012 <br /> Grant Wyffels <br /> Public Works Director <br /> City of New Brighton <br /> City Hall <br /> 803 Old Highway 8 NW <br /> New Brighton, MN 55112 <br /> Re: WTP#1 Iron Vessel Platform Modifications <br /> Improvement No. 12-06 <br /> Dear Mr. Wyffels: <br /> Please find enclosed the final invoice from CNC Metalcraft, LLC for work completed on the above- <br /> referenced project. Barr has performed a final walk-through to review the punch-list items, and <br /> recommends final payment for the project. <br /> Along with the final invoice, CNC Metalcraft has provided a $1,350 credit to apply towards repairing the <br /> floor areas that were damaged during construction. Also enclosed with this submittal is another CNC <br /> invoice for$600 for the welding inspection required by the City,but not included in the original project <br /> scope. Finally, Minnesota Department of Revenue Witholding Affidavit for Contractors (Form IC-134) is <br /> enclosed. <br /> Barr recommends payment to CNC Metalcraft, LLC in the amount of$21,283.50. This represents the <br /> final 30%of the initial contract amount,the $1,350 credit, and the $600 welding inspection. <br /> Please contact me at 952-832-2693 if you have questions about this recommendation for payment. <br /> Respectfully yours, <br /> jututM,64 <br /> Julia Macejkovic, P.E. <br /> Enclosure <br /> cc: CNC Metalcraft, LLC [via email] <br /> Barr Engineering Co. 4700 West 77th Street, Suite 200, Minneapolis, MN 55435 952.832.2600 www.barr.com <br />