My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-23-2012.
NewBrighton
>
Council
>
Packets
>
2012
>
CCP 10-23-2012.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 2:16:41 AM
Creation date
10/19/2012 1:53:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL PAYMENT <br /> PROJECT 12-12, PAINTING SILVER LAKE ROAD STREET LIGHTS <br /> PROJECT LOCATION: CITY OF NEW BRIGHTON, MN <br /> HERBST SANDBLASTING LLC <br /> NO. DESCRIPTION UNIT QUANITY <br /> UNIT PRICE TOTAL PRICE <br /> 1 80 STREET LIGHTS EACH 80.0 $125.00 $10,000.0C) <br /> 2 24 SIGNAL LIGHTS EACH 24.0 $187.00 $4,488.00 <br /> 3 19 PUSH BUTTON PEDESTALS EACH 19.0 $65.0C) $1,235.00 <br /> 4 100 LIN FT IRON RAILING LIN FT 100.0 $18.00 $1,800.00 <br /> 5 65 LIN FT IRON RAILING LIN FT 65.0 $18.00 $1,170.00 <br /> 6 4 PARKING LOT LIGHTS EACH 4 0 $125.00 $500.00 <br /> 7 FRONT STAIR RAIL AND BIKE RACK LUMP SUM 1.0 $600.00 $600.00 <br /> TOTAL CONSTRUCTION COST $19,793.00 <br /> NB Share $16,908.00 <br /> St.Anthony Share $2,885.00 <br /> G:\ENG\2012proj\12-12 Silver Lake Road Street Lights\QUOTETABULATION.xlsl 10/17/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.