My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 06-26-2012 Part 9
NewBrighton
>
Council
>
Packets
>
2012
>
2012 Council Work Session Materials
>
06-26-2012
>
WS 06-26-2012 Part 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 4:24:44 PM
Creation date
11/6/2012 12:34:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ito city of <br /> gipNEW <br /> BRIGHTON <br /> ...Ike :st that works for low <br /> City of New Brighton <br /> Projected Annual Gross TIF Revenues by Scenario <br /> for the New Brighton Exchange <br /> 3,000,000 <br /> 2,500,000 <br /> 2,000,000 - <br /> s- 1,500,000 <br /> 1,000,000 <br /> 500,000 - <br /> 0 - ,. r T1 I1 <br /> O N N N N N N 0 M M C <br /> � O O rO O O NO O O NO NO O O M CO) M <br /> NNNNN N N NNNNN NNNNNNNNN NNNN N N <br /> Years <br /> —Pulte Plan 1 --Pulte Plan 2 —Pulte Plan 3 Concept Plan 1 —Concept Plan 2 —As Is Scenario <br /> I <br /> Notes: 1) Pulte Plan 1 assumes all other blocks within the New Brighton Exchange develop at the same pace as Concept Plan 1 <br /> 2) Pulte Plan 2 assumes all other blocks within the New Brighton Exchange develop at the same pace as Concept Plan 2 <br /> 2) Pulte Plan 3 assumes all other blocks within the New Brighton Exchange develop at the same pace as Concept Plan 1 <br /> 6/14/2012 el EHLERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.