My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 06-26-2012 Part 9
NewBrighton
>
Council
>
Packets
>
2012
>
2012 Council Work Session Materials
>
06-26-2012
>
WS 06-26-2012 Part 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 4:24:44 PM
Creation date
11/6/2012 12:34:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID city of <br /> laBRIGHTON <br /> EW <br /> the c►►r that ,+orks for you <br /> City of New Brighton <br /> Projected Annual Ending Cash Balance <br /> Incorporating All Revenue Sources <br /> for the New Brighton Exchange <br /> 30,000,000 - <br /> 25,000,000 <br /> 20,000,000 <br /> 15,000,000 - <br /> 8 10,000,000 - - <br /> 5,000,000 <br /> r N M vt U7 CO f,- c0 O .- N M CO I` c10 C) O N M `d to CO <br /> r r a 0 0 0 0 r 0 N0 0 0 N N N M 0 M M M M M <br /> N _ <br /> (5,000,000) —4l -N N NN SJ,—CV_-_SN_C1l N N N (N [��_�y (��(�I (� C1( (�, <br /> Years <br /> Pulte Plan 1 Pulte Plan 2 Pulte Plan 3 Concept Plan 1 Concept Plan 2 As Is Scenario 1 <br /> Notes: 1) Pulte Plan 1 assumes all other blocks within the New Brighton Exchange develop at the same pace as Concept Plan 1 <br /> 2) Pulte Plan 2 assumes all other blocks within the New Brighton Exchange develop at the same pace as Concept Plan 2 <br /> 3) Pulte Plan 3 assumes all other blocks within the New Brighton Exchange develop at the same pace as Concept Plan 1 <br /> 6/14/2012 elk EHLERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.