Laserfiche WebLink
New Brighton 2013 Fee Register <br /> BUILDING: <br /> Description 2013 <br /> Restamping job site plan sets $26.00 <br /> Footing/foundation permit prior to full permit issuance Based on Valuation of a full building permit,minus <br /> -Residential&Commercial the plan review,plus a full building permit upon <br /> the issuance of the shell permit. <br /> Certificate of Occupancy <br /> -Temporary/Conditional Certificate of Occupancy $500.00 plus a letter of credit equal to the remaining zoning requirements <br /> -Full Certificate of Occupancy $16.00 <br /> -Copy $6.00 <br /> Site Assessment for Fire Works See Public Safety Fee Schedule Explosive Permits <br /> Temp Membrane Structure,Tents&Canopies-Greater than 120 Sq Ft $85.00 <br /> Plumbing <br /> Sump pump inspection $60.00 <br /> Residential Plumbing permit issuance charge Minimum$50.00 fee or 1.5%of project cost or <br /> which ever is greater <br /> Water Heater $50.00 <br /> Water Softener $50.00 <br /> RPZ(Backflow Device) $55.00(New or Replacement) <br /> Commercial&Industrial Permit Minimum$150.00 fee or 1.5%of project cost or <br /> which ever is greater <br /> Administrative Fee $15.00 <br /> Commercial Plan Review Fee City will review plans that are valued less than$1,500.00. <br /> Accelerated review(Total x 2)Review completed within 15 business days <br /> or%of the submitted fee refunded Plan Review Fee will be 50%of permit. Work valued over$1,500.00 will <br /> need to be reviewed by the State of Minnesota <br /> State Surcharge Fee .0005%x valuation of job(minimum fee=$5.00) <br /> Mechanical <br /> Mechanical permit issuance fee Minimum of$45.00 <br /> Mechanical Permit 1.5%of contract cost <br /> Residential 1&2 family dwelling $125.00(New Construction;1-2 Family Dwelling) <br /> $45.00(Furnace) <br />