Laserfiche WebLink
New Brighton 2013 Fee Register <br /> BUILDING: <br /> Description 2013 <br /> $45.00(Gas/Electric Range) <br /> $45.00(Gas Piping) <br /> $45.00(Air Conditioning) <br /> 65.00 ea(Gas Line&Fireplace) <br /> Other <br /> $45.00(Other) <br /> Commercial&Industrial Minimum of$45.00 or 1.5%of the improvement cost, <br /> whichever is greater. <br /> Temp heat permit $100 per temp heater <br /> Commercial Plan Review Fee 45%of Permit Fee <br /> Accelerated review(Total x 2)Review completed within 15 business days <br /> or%2 of the submitted fee refunded <br /> Administrative Fee $15.00 <br /> State Surcharge Fee .0005%x valuation of job(minimum fee=$5.00) <br /> Building Moving Fees <br /> Pre-inspection fee S75.00 <br /> Moving Principle Building into City $300.00 <br /> Moving over private property $30.00 <br /> Moving over public streets <br /> Larger than 12 ft high, 14 feet wide, $75.00 <br /> 25 Feet long <br /> No larger than 12 feet high, 14 feet wide, $40.00 <br /> 25 Feet long <br /> Excavating/Grading Fees <br /> 50 cubic yards or less $42.00 <br /> 51 to 100 cubic yards $49.00 <br /> 101 to 1,000 cubic yards* $49.00 for the first 100 cubic yards,plus$10.50 for each <br /> additional 100 cubic yards or fraction thereof. <br /> 1,001 to 10,000 cubic yards $167.00 for the first 1,000 cubic yards,plus$9.00 for each <br /> additional 1,000 cubic yards or fraction thereof. <br /> 10,001 to 100,000 cubic yards $273.00 for the first 10,000 cubic yards,plus$40.50 for each <br /> additional 10,000 cubic yards or fraction thereof. <br /> 100,001+cubic yards or more $662.50 for the first 100,000 cubic yards,plus$22.50 for each <br /> additional 100,000 cubic yards or fraction thereof. <br /> Administrative Fee $15.00 <br /> *Over 100 Cubic Yards is required to pull a SWWPP Permit <br />