Laserfiche WebLink
New Brighton 2013 Fee Schedule <br /> PUBLIC WORKS: <br /> 2013 <br /> Description Proposed <br /> Residential pool filling from hydrant-costs for water usage&service fee 95 <br /> Deposits required for:hydrant usage,fire hose,wrench <br /> Hydrant meter usage-cost for service fee 50 <br /> Charges for:water usage at current rate and applicable sales tax <br /> Deposits required for:hydrant meter,hydrant usage,adapter,wrench <br /> Hydrant meter deposit-$1,500 for 3 inch meter <br /> Hydrant meter deposit-$1,025 for 2 inch meter <br /> Hydrant meter deposit-$800 for 1 1/2 inch meter <br /> Hydrant meter deposit-$440 for 3/4 inch meter <br /> Hydrant usage deposit-$425 <br /> Hydrant hose adapter deposit-$75 <br /> Hydrant wrench deposit-$50 <br /> Water meters shall be based on the cost of the water meter,radio <br /> transmitter,fittings, freight,and sales tax. <br /> Meter Size: <br /> 3/4"(residential) 400 <br /> 1" 500 <br /> 1 1/2" 825 <br /> 2" 1150 <br /> 3"(compound) 3600 <br /> 4"(compound) 4800 <br /> City Sewer Connection Charge per MCES SAC 185 <br /> City Water Connection Charge per MCES SAC 545 <br /> (Note: The connection charges cover the costs of core facilities <br /> such as new wells,pump stations,lift stations,water treatment <br /> facilities,and reservoirs. The charge includes inpsection permit <br /> fees for these connections.) <br /> Sewer or Water Connection Inspection for Repair 95 <br /> (Note: This is$75 for water&$75 for sewer,$15 admin&$5 State) <br /> Street or Curb Cut: <br /> Deposit 650 <br /> Permit 80 <br /> Courtesy benches within right-of-ways: <br /> Initial inspection per bench 30 <br /> Initial permit per bench 35 <br /> Annual permit renewal per bench 30 <br /> Equipment Rental <br /> Sweeper and Operator(per Hour)-One Hour Minimum 125 <br /> Dump Truck and Driver(per Hour)-One Hour Minimum 125 <br /> Other Equipment Rental refer to PW billable rate schedule <br /> Engineering <br /> Assessment Search 40 <br /> Right of Way: <br /> Registration Fee 50 <br /> Excavation Permit Fee 160 <br /> Obstruction Permit Fee(not required with excavation permit) 75 <br /> Permit Extension 50 <br /> Delay Penalty(plus$25 permit extension fee) 25 <br />