My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-09-2013
NewBrighton
>
Council
>
Packets
>
2013
>
CCP 04-09-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 8:54:05 PM
Creation date
4/8/2013 3:39:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The surface at the Freedom Park skate park requires an overlay to create a new/smooth surface for the <br /> installation of equipment purchased in 2012. Currently the existing Skate Park equipment remains <br /> onsite and will be used until the new pavement is scheduled for placement. With the paving equipment <br /> onsite, staff plans on extending the proposed overlay to cover the adjacent hard court. This will create a <br /> smooth surface throughout the area and a seamless transition between the basketball and skating areas. <br /> The tentative schedule is to prepare plans for a mill and overlay and advertise for bids for an early <br /> summer construction. Staff will return to the Council for approval of the bids and authorization of <br /> construction. <br /> Bid Opening: June 18, 2013 <br /> Council Approvals: June 25, 2013 <br /> Start Construction: July 2013 <br /> Costs and Funding: The cost estimate to mill and overlay portions of these streets and the Freedom <br /> Park Skate Park is $220,000, which would be funded from MSA construction/maintenance and PMP <br /> funds. <br /> jrA, <br /> Cra' hlichting, P.E. <br /> Senior Engineering Supervisor <br /> Attachments <br /> Aerial Plan Overview <br /> Existing Pavement Condition Photos <br />
The URL can be used to link to this page
Your browser does not support the video tag.