My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-28-2013
NewBrighton
>
Council
>
Packets
>
2013
>
CCP 05-28-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 10:22:32 PM
Creation date
5/24/2013 11:49:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Costs and Funding: <br /> The quote from Flanagan Sales,Inc.,includes all labor,material and equipment to complete the retrofit. There is <br /> $40,000 in the non-fleet budget for the replacement of this playground which would mean a savings of$6,363.77. <br /> 44 Zia <br /> Chris Wolla <br /> Parks Superintendent <br /> Attachments: <br /> Quote <br /> Comparison Quote(if new) <br /> Drawing <br />
The URL can be used to link to this page
Your browser does not support the video tag.