Laserfiche WebLink
l�- - •. III <br /> I LE <br /> resourceful. naturally. <br /> engineering and environmental consultants P— i <br /> June 25,2013 <br /> Grant Wyffels <br /> Public Works Director <br /> City of New Brighton <br /> City Hall <br /> 803 Old Highway 8 NW <br /> New Brighton,MN 55112 <br /> Re: WTP#1 Piping and Chem. System &Well House 314& 15 Meter Upgrades <br /> City Project 12-16— Pay Application #3— Final Payment <br /> Dear Mr.Wyffels: <br /> Enclosed please find an invoice from Shank Constructors,Inc.for the above-referenced project at WTP#1 <br /> and Well House 3/4& 15. The invoice includes work completed between April 26 and June 25,2013. <br /> The work completed to date includes installation of combination air valves,pressure regulating valve on <br /> GAC backwash pipe, 14-inch backwash manifold valve,backwash and air gap pit float supports, <br /> chemical room modifications,installation of new flow meters in Well House 3/4 and 15,modifications at <br /> the Fridley booster station,and Work covered under Change Order 1. <br /> The work was completed successfully and has been accepted by city water department staff. Barr <br /> recommends payment of this invoice in the amount of$11,850.00 to Shank Constructors,Inc. This <br /> represents the total Work done to date($140,100),minus the previous payments($128,250). The amount <br /> remaining in the contract is$0,and this represents final payment. <br /> Please see the enclosed invoice for further details. <br /> Please call me at 952-832-2693 if you have questions regarding this project or any of the projects related <br /> to the NBCGRS. <br /> Respectfully yours, <br /> Julia Macejkovic,P.E. <br /> Julik-4711ac,,koz,ca <br /> Enclosure <br /> cc: Shank Constructors,Inc. <br /> Barr Engineering Co. 4700 West 77th Street,Suite 200,Minneapolis, MN 55435 952.832.2600 www.barr.com <br />