Laserfiche WebLink
Public Works/Engineering Comments <br /> Public Works/Engineering reviewed the plans and provided comments within the Interoffice <br /> Memorandum dated 8/12/2013 (see attached). These comments are minor and do not affect the <br /> overall Site Plan layout. The applicant shall incorporate these comments in the final plans. <br /> STAFF RECOMMENDATION <br /> Staff recommends approval of the Site Plan, subject to the following conditions: <br /> 1. The proposed Site Plan is constructed in a manner consistent with the plans submitted <br /> and made a part of the Planning Report dated 8/14/2013. <br /> 2. Continued compliance with the conditions of Resolution 13-012, except as otherwise <br /> revised as part of this request. <br /> 3. Implementation of the original Landscape Plan approved on January 22, 2013, except as <br /> otherwise revised as part of this request. <br /> 4. All lighting shall comply with the standards outlined in Zoning Code Section 11-010(6). <br /> 5. Both tenants shall comply with the sign standards in Section 9-080 and the multiple <br /> occupancy standards in Section 9-110. <br /> 6. Incorporation of the comments contained in the Interoffice Public Works/Engineering <br /> Memo dated 8/12/2013. <br /> 7. Prior to release of the building permit, the applicant shall provide evidence of a <br /> Watershed District Permit that includes the proposed addition. <br /> cypivd_ auteutto, <br /> Janice Gundlach, City Planner <br />