My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EDC 06-18-2013
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2013
>
EDC 06-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 11:37:12 AM
Creation date
9/18/2013 9:58:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Miller Dump Closure <br /> Timeline <br /> February 2007: DRAP submitted to MPCA for Reconstruction of Old Highway 8. <br /> July 2007: Amendment to DRAP submitted to MPCA for Reconstruction of <br /> Old Highway 8. <br /> Summer 2007: City and its contractor re-construct Old Highway 8 and remove <br /> some dump materials along western edge(near Block E). <br /> December 2007: RAP Implementation Report submitted to MPCA for . <br /> Reconstruction of Old Highway 8. <br /> Winter 2008: City contemplates clean-up of former Miller Dump and applies for <br /> the spring 2008 grant cycle with DEED and Met Council. <br /> February 2008: Response Action Plan(RAP) submitted to MPCA for Eastern <br /> Portion of Northwest Quadrant(VP18560 and Leak ID 589). <br /> April 2008: City applies for grant funding through DEED and Met Council <br /> for dump closure project. <br /> June 2008: City awarded grants from DEED($2.6M)and Met Council <br /> ($1.4M). <br /> Summer 2008- City and its contractor completes the initial phase of the Miller <br /> Spring 2009: Dump closure: <br /> o Demolition of buildings. <br /> o Sealing of abandoned wells. <br /> o Excavation of contaminated soils and dump materials. <br /> o Salvage of existing clean cover soils. <br /> o Consolidation of some dump materials. <br /> o Installation of area-wide landfill gas collection and venting <br /> system. Liner installed over dump, except Block B. <br /> o Construction of clean cover soils(cap)over footprint of dump. <br /> City spent$7.2M on project. <br /> March 2009: Contingency Action Plan for Landfill Gas Control submitted to <br /> MCPA. <br /> April 2010: RAP Implementation Report submitted to MPCA for review and <br /> approval. (Not approved to date) <br />