My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-24-2013
NewBrighton
>
Council
>
Packets
>
2013
>
CCP 09-24-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 2:06:27 AM
Creation date
9/24/2013 5:15:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF NEW BRIGHTON CONTRACTOR: Northwest Asphalt,Inc. <br /> ENGINEERING DEPARTMENT 1451 Stagecoach Road <br /> Shakopee,MN 55379 <br /> September 13,2013 PHONE:(952)445-1003 <br /> FAX:(952)445-1056 <br /> CHANGE ORDER 1 <br /> PROJECT 13-1,2013 Street Rehabilitation <br /> PURPOSE/DESCRIPTION: This change order includes extra crew time to address the relocation and installation of storm sewer,sanitary sewer,watennain <br /> and proposed structures or services to cross existing gas,fiber optic,electrical and telephone/cable lines. This change order also includes the replacement of <br /> an existing bituminous trail that was used to access and install the stormwater pond outlet structure. As part of the trail replacement,the contractor will also <br /> install a new storm sewer catch basin and pipe to collect localized drainage and direct it to the pond. This work was not anticipated at the time of the bid and <br /> would need to be paid for by change order. <br /> ACTION: <br /> THE FOLLOWING ESTIMATED QUANTITIES TO THE CONTRACT DOCUMENTS HAVE BEEN MODIFIED: <br /> ESTIMATED UNIT EST. <br /> ITEM QUANTITY PRICE QUANTITY TOTAL <br /> ADD <br /> 2350.511 TYPE LV1 WEARING COURSE PATH REPAIR(3"BIT-6"GRAVEL) SQUARE FEET $2.35 2,100 $4,935.00 <br /> 2545.601 UTILITY INSTALLATION WITH COORDINATION AROUND SMALL UTILITIES LUMP SUM $19,337.57 1 $19,337.57 <br /> 2545.601 STORM SEWER INSTALLATION(27"MH AND 8-INCH PVC) LUMP SUM $3,000.00 1 $3,000.00 <br /> TOTAL OF ADDED ITEMS $27,272.57 <br /> TOTAL OF DEDUCTED ITEMS $0.00 <br /> TOTAL OF CHANGE ORDER 1 $27,272.57 <br /> ORIGINAL CONTRACT AMOUNT $1,091,005.46 <br /> PREVIOUS CHANGE ORDERS $0.00 <br /> CONTRACT PRICE PRIOR TO CHANGE ORDER $1,091,005.46 <br /> NET INCREASE OF CHANGE ORDER $27,272.57 <br /> NEW CONTRACT PRICE WITH CHANGE ORDERS $1,118,278.03 <br /> CHANGE IN CONTRACT TIME +14 DAYS <br /> ( <br /> DATE <br /> APPROVED BY: I 13 <br /> GRANT WYFIIELS,PE <br /> DIRECTOR OF PUBLIC WORKS <br /> CITY OF NEW BRIGHTON <br /> APPROVED BY: _ DATE <br /> NORTHWEST ASPHALT <br /> APPROVED BY COUNCIL ACTION:SEPTEMBER 24,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.