CITY OF NEW BRIGHTON <br />ENGINEERING DEPARTMENT <br />Project 14-14 Iron/Manganese Removal System Filter Rehabilitation - WTP #1 <br />PARTIAL PAYMENT 1 <br />DATE: March 28, 2014 <br />CONTRACTOR: Rice Lake Construction Group <br />22360 Country Road 12, PO Box 517 <br />Deerw00d, MN 56444 <br />PHONE: (218) 546 -5519 <br />FAX: (21 B) 546.7016 <br />N0. <br />DESCRIPTION <br />UNIT <br />ESTIMATED <br />UNIT PRICE <br />PROJECT TOTAL <br />PAYMENT <br />QUANTITY <br />COST <br />QUANTITY PREY <br />QUANTI7YTHIS <br />PAYMENT <br />QUANTITY TO <br />DATE <br />TOTAL QUAN71TY <br />COST <br />1 <br />SITE MOBILIZATION, TEMP ENT, DEMOB <br />LUMP SUM <br />$35,000.00 <br />1.0 <br />$35,000.0 <br />0,9 <br />0.9 <br />1 <br />$31,500,0 <br />2 <br />REMOVE MEDIA AND GRAVEL <br />EACH FILTER <br />$23,500.00 <br />4.0 <br />$94,000.0 <br />1 <br />1 <br />4 <br />$23,500 -0- <br />3 <br />FILTER VESSEL INLET PIPE INSPECTION <br />EACH FILTER <br />$500.00 <br />4.0 <br />$2,000.0 <br />1 <br />1 <br />4 <br />$500.0 <br />3.1 <br />REMOVE EXISTING AND PROVIDE NEW AIR WASH DISTRIBUTOR PIPING <br />EACH FILTER <br />$600000 <br />4.0 <br />$24,000.0 <br />0,5 <br />0.5 <br />4 <br />$3,000.0 <br />4 <br />4REMOVE AND INSPECT UNDERDRAIN NOZZLES <br />EACH FILTER <br />$2,000,00 <br />4.0 <br />$8,000.0 <br />1 <br />1 <br />4 <br />$2,000,0 <br />5 <br />WELD REPAIRS- FILLET WELD UP TO 5116- <br />PER INCH <br />$150.00 <br />48.0 <br />$7,200.0 <br />48 <br />6 <br />WELD REPAIRS- FULL PENETRATION GROVE WELD UP TO 1/2" <br />PER INCH <br />$150 00 <br />12,0 <br />$1,800.0 <br />12 <br />6.1 <br />ASME VESSEL RECERTIFICATION <br />EACH FILTER <br />$1,200.00 <br />4.0 <br />$4,8010 <br />4 <br />7 <br />INSTALL INTERIOR COATINGS <br />EACH FILTER <br />$28,000,00 <br />4.0 <br />$112,000,0 <br />4 <br />8 <br />REMOVE AND PROVIDE NEW SAMPLE TAP SCREENS <br />EACH <br />$45,00 <br />80,0 <br />$3,600.0 <br />80 <br />9 <br />RE- INSTALL UNDERDRAIN NOZZLES <br />EACH FILTER <br />$2,500.00 <br />4.0 <br />$10,000.0 <br />4 <br />10 <br />PROVIDE NEW GRAVEL BASE MATERIAL <br />EACH FILTER <br />$20,000.01 <br />4.0 <br />$80,0000 <br />4 <br />11 <br />RE- INSTALL GRAVEL RETAINING SCREENS <br />EACH FILTER <br />$1,000.01 <br />4.0 <br />$4,000.0 <br />4 <br />12 <br />PROVIDE NEW MANGANESE AND GREENSAND <br />EACH FILTER <br />$42,400.01 <br />4.0 <br />$169,60010 <br />4 <br />13 <br />PROVIDE NEW ANTHRACITE <br />EACH FILTER <br />$20,000.0 <br />4.0 <br />$50,000.0 <br />4 <br />14 <br />PROVIDE ACCESS MANWAY GASKETS <br />EACH <br />$70.0 <br />28.0 <br />$1,960,0 <br />28 <br />15 <br />PERFORM DISINFECTION AND BACTERIOLOGICAL TESTING <br />EACH FILTER <br />$500.01 <br />4.0 <br />$2,000.0 <br />4 <br />ALT BID <br />16 <br />NOTUSED <br />17 <br />FURNISH NEW GRAVEL RETAINING SCREEN <br />_ EACH FILTER <br />EACH NOZZLE <br />$2,000.0 <br />$30.0 <br />1.0 <br />$2,000.0 <br />1 <br />18 <br />FURNISH UNDERDRAIN NOZZLES <br />100.0 <br />$3,000.0 ' <br />100 <br />16 IREMOVE <br />EXISTING AND PROVIDE NEW INLET DISTRIBUTOR PIPING <br />EACH CELL <br />$1,000.0 <br />5.0 <br />$5,OOD.O <br />5 <br />CONSTRUCTION COST <br />$649,960.00 <br />$60,500.00 <br />ORIGINAL CONTRACT $649,960.00 <br />Previous Change Orders <br />Change Order 1 <br />Sub -total $649,960.00 <br />Partial Payment 1 Change Order 1 TOTAL WORK TO DATE $60,500.00 <br />Less Retainage 6% $3,025.00 <br />Sub -total $57,475.00 <br />Total of Partial Payment 1 $57,475.00 <br />PAMpls\23 MN162Q3622101W.NFiIWMainlenence Projects\Z014 ProjeclslFilter Rehebillletlon \Constructlon\(G) Pay applicatichMPA1\PP1.As 3/28/2014 <br />