My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-08-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 07-08-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 12:19:02 PM
Creation date
7/3/2014 3:09:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
resourceful. naturally. BAR R <br />engineering and environmental consultants <br />June 27, 2014 <br />Grant Wyffels <br />Public Works Director <br />City of New Brighton <br />City Hall <br />803 Old Highway 8 NW <br />New Brighton, MN 55112 <br />Re: Iron /Manganese Removal System Filter Rehabilitation — WTP #1 <br />City Project 14 -4, Pay Application #3 <br />Dear Mr. Wyffels: <br />Enclosed please find an invoice from Rice Lake Construction Group for the above - referenced project at <br />WTP #1. The invoice includes work completed between project initiation and June 16, 2014. <br />The work completed to date includes site mobilization including construction of a temporary entrance and <br />the complete Work of one filter. <br />Outstanding items include the following base bid and alternative bid items: <br />Base and alternative bid items <br />1. Demobilization <br />2. Removal of media and gravel (3 filters) <br />3. Filter vessel inlet pipe inspection (3 filters) <br />4. Removal of existing, provide new inlet distributor piping (3 filters) <br />5. Removal of existing, provide new air wash distributor piping (3 filters) <br />6. Removal of existing, provide new underdrain nozzles (3 filters) <br />7. Removal of existing, provide new underdrain supports (3 filters) <br />8. Removal of existing, furnish new stainless steel studs, clips and washers, pipe anchors (3 filters) <br />9. Removal of existing, provide new sample tap screens (60 screens) <br />10. Stud welding of steel studs, clips and washers, and pipe anchors (3 filters) <br />11. Sandblast and installation of interior coatings (3 filters) <br />12. Provide new gravel retaining screens (3 filters) <br />13. Provide new gravel base material (3 filters) <br />14. Provide new greensand and anthracite (3 filters) <br />15. Provide access manway gaskets (21 manways) <br />16. Perform disinfection and bacteriological testing (3 filters) <br />Barr Engineering Co. 4700 West 77th Street, Suite 200, Minneapolis, MN 55435 952.832.2600 www.barr.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.