My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-08-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 07-08-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 12:19:02 PM
Creation date
7/3/2014 3:09:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Grant Wyffels <br />June 27, 2014 <br />Paae 2 <br />17. ASME vessel recertification (3 filters) <br />During work on filter vessel #4, the coating sub - contractor experienced existing conditions causing extra <br />time and different equipment to be used than what was originally assumed in the base bid. Change Order <br />2 has been submitted regarding this change. The Contractor will not profit because of their initial low <br />bid, but be compensated at cost for items above their original proposal. This change order constitutes a <br />final not to exceed price, and the City reserves the right to ask for additional cost documentation for <br />negotiating a lower price if work conditions change on the remaining filters. <br />Barr recommends payment of this invoice in the amount of $147,621.69 to Rice Lake Construction <br />Group. This represents the total work to date ($253,419.65) minus 5% retainage ($12,670.98) minus <br />previous payments ($93,126.98). The amount remaining in the original contract plus change orders 1 and <br />2 is $555,424.73. Please see the enclosed invoice for further details. <br />Please call me at 952- 832 -2693 if you have questions regarding this project or any of the projects related <br />to the NBCGRS. <br />Respectfully yours, <br />0 <br />Julia Macejkovic, P.E. <br />Enclosure <br />cc: Rice Lake Construction Group <br />PAMpls\23 MN \62\23622IMorkFiles \Maintenance Projects \2014 Projects\Filter RehabilitationTonstruction \(G) Pay <br />applications \PA3\Parts \PA 3.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.