Laserfiche WebLink
filik <br /> NOR-SON <br /> Build well.Be well. <br /> Janice Gundlach <br /> Community Development Department <br /> Planning and Zoning <br /> 803 Old Hwy 8NW <br /> New Brighton,MN. 55112 <br /> RE: APi Training Center and Offices <br /> Narrative for Land Use Application <br /> 1320 Old Hwy 8 NW <br /> Summary: <br /> Our project includes new construction of a 45,000 gross square foot three story training facility <br /> and office building and associated site improvements for APi Group located on the southerly one <br /> half of Lot 1 Block 3 Long Lake Landing(approximately 2 acres). Timetable for construction <br /> includes site work beginning Fall of 2014,building foundations Spring of 2015,and occupancy by <br /> Winter 2015. <br /> Grading and Drainage: <br /> Project will require the import of fill soils and will be graded to drain to the west where we will tie <br /> into existing storm sewer infrastructure. The proposed design meets the criteria of the Rice Creek <br /> Watershed District. <br /> Site Utilities: <br /> The project will connect to existing water and sewer services along the west edge of the site. The <br /> project will utilize 6"sanitary sewer and an 8"water service,which will be split at the building <br /> mechanical room into 2"domestic water and 6"fire protection lines. <br /> Parking: <br /> Parking capacity meets the minimum requirements of the city of New Brighton (4 stalls per 1,000 <br /> net square feet). Our schematic floor plans show a net floor area of 27,007 s.f.,which will results in <br /> a total parking requirement of 108 stalls. In an effort to show compliance with the LEED Rating <br />